Laserfiche WebLink
• The Fitness and Teachers station were discussed. <br />• The vestibule at the east entrance was made larger for students waiting for pick, with a 7 foot <br />canopy and 20' x 20' inside waiting area. <br />• PBC asked about access locations into the courtyard. <br />• There are two student entrances into the courtyard and access doors for a truck to fit through for <br />maintenance. <br />• PBC asked if the courtyard is large enough to be used for event space. Design is not set up for <br />event space and is meant for classroom /student use. <br />• DiNisco discussed materials for the building, adopted matching the red brick in certain areas, <br />and then selecting another color combination which can be reviewed. <br />• PBC asked about the use of passive daylight and DiNisco informed the group lighting will be the <br />same as used at Estabrook, dim closest to the windows, with daylight harvesting monitors, but it <br />is difficult getting daylighting all the way into the classrooms. <br />• PBC commented on the apparent size and height of the stairway to the roof. The ceiling height <br />in the cafeteria was also mentioned and if it is too low, sound /noise levels could be a concern. <br />• DiNisco is working on bringing the stairwell down, and will review the cafeteria ceiling height. <br />6. Clarke and Diamond Summer Renovation Cost Breakdown— Hill Int. <br />• Presented the costs of doing the locker rooms as a standalone project. This would be at a cost <br />of $4,105,000, which is moving forward, regardless of the outcome of the 5/3 vote. <br />7. Estabrook/Proiect Cost Summary — Hill Int. <br />• Hill handed out the MSBA summary and discussed the PFA budget. <br />• The project came in on budget, with Hill stating, the project was managed successfully without <br />needless spending which allowed money to be returned at the end of the project. <br />• Hill stated he would send out full audit report if anyone wanted it. <br />• PBC asked if Shawmut is all closed out and completed; Yes they are. <br />• Final reimbursement to the Town from the MSBA was $11,984,683 or 37.27 %. <br />• Silver LEED Certificates were received from LEED for the project. <br />• All Three of the prime vendors on the project Shawmut, DiNisco and Hill returned un -spent <br />funds to the Town. <br />8. New Project Manager for Bond <br />• Dave Doherty was introduced as the new project manager for Bond Brothers Construction. He <br />just completed a massive newly built dorm project at Boston College. <br />PCB Meeting 03.07.16 <br />Page 3 <br />