|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2016-02-29-GCC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Greenways Corridor Committee-GCC
>
Minutes
>
2011-2019
>
2016
>
2016-02-29-GCC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 6:18:30 PM
Creation date
5/3/2016 4:54:46 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - GCC - Greenways Corridor Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
from much of the town. We discussed a change of the route which picks up another existing <br />trail, gets users off streets more, and shortens the route a bit. Bob, Eileen, and Peggy will <br />walk the new version, and will discuss location of posts and signs for the entire route. This <br />will be Route G. <br />Keith will contact Karen Mullins (Conservation), Aaron Henry (Planning) and the Engineering <br />Dept for any necessary permissions for Route G. Mike will be in charge of updating the <br />maps. <br />We will have about $500.00 in CPA funds left at the close of FY16. These funds roll back to <br />CPC. We can request more funds as needs arise. <br />A decision was made - no official vote taken - to hold off on making decisions about wayfind- <br />ing signage. Peggy and Keith talked to Elaine Doran of the Historical Society about access- <br />ing historic photos, which we might be able to incorporate into future interpretation of <br />ACROSS routes. The Worthen Collection at Cary Memorial Library has many digitized pho- <br />tos. <br />An Eagle Scout contact GCC about putting a bench along a route. Keith will forward to the <br />appropriate authority once he has more information. <br />New Business: <br />• none at this time <br />Next Meeting <br />: March 28, 2016, 4:30-6:00pm, DPW Training Room <br />Future meeting dates: April 25, May 23, June 27 <br />Future Agenda Items: <br />- <br />Certification of ACROSS Lexington Completion program update - Gil Benghiat <br />- <br />Easement/Town Access Project <br />Respectfully Submitted by <br />Alexandra Dohan, Secretary <br />
The URL can be used to link to this page
Your browser does not support the video tag.