Laserfiche WebLink
APPROPRIATION COMMITTEE -2016 ATM & STM 2016 -3 <br />ance with the MSBA process (see Article 2016 -1.3 below). The original $520,000 appropriation for Has- <br />tings at the November 2015 STM #1 will be rescinded if it cannot be used for any other valid purpose. <br />November 2015 Special Town Meeting #2 <br />The November 2015 STM #2 requested $2,500,000 under Article 4 (Appropriate for Water System Im- <br />provements). The request was funded using debt under the Water Enterprise Fund. The request was ap- <br />proved and, as a result, there will be no further requests for debt -based appropriations under the Water <br />Enterprise Fund in the FY2017 budget. <br />Special Town Meeting 2016 -1 <br />Article 2016 -1.2 (Amend Regional School District Agreement of the Minuteman Regional Vocational <br />School District) was approved, allowing six member communities to exit the Regional District, and pav- <br />ing the way for reconstruction of the Minuteman High School with significant financial support from the <br />MSBA. <br />Article 2016 -1.3 (Appropriate for Hastings School Feasibility Study) was approved. This will fund the <br />feasibility study and schematic design work at Hastings Elementary under the MSBA process. Once the <br />resulting design is approved by the MSBA, a second appropriation will be requested to fund full construc- <br />tion documents and the actual construction. The project cost has been estimated at $60 million, of which <br />approximately $20 million would be eligible for MSBA reimbursement. This estimate assumes a 30- <br />classroom school, and is subject to change based on the MSBA review. We anticipate that a new Hastings <br />Elementary will be ready for occupancy by September 2019. <br />Special Town Meeting 2016 -2 <br />Article 2016 -2.2 (Land Purchase — 20 Pelham Road) has not been taken up by Town Meeting due in part <br />to delays in negotiations with the current owners, but also to obtain results from an engineering study <br />considering ways to improve roadway access to the site. On March 21, 2016, Town Meeting will consider <br />a motion from the Selectmen on how to proceed with this article. <br />School Master Plan <br />The School Committee, in cooperation with the Superintendent, Town staff and the finance committees, <br />has continued to refine their recommended plan to address the growing enrollment, particularly in the el- <br />ementary and middle school levels. The plan contains a mix of administrative and physical changes. Ma- <br />jor renovations to the two middle schools will add more space while also integrating key maintenance <br />work. Redistricting some students will improve classroom utilization district -wide. Changing the way <br />some educational programs are implemented will reclaim a small amount of additional space. <br />The FY2017 Budget <br />The Town Manager has proposed a balanced, level- service budget that is not contingent on an operating <br />override. The table and chart below comprise the General Fund budget totaling $198,562,732. This does <br />not include enterprise funds, revolving funds, Community Preservation Act funds, grants, or exempt debt <br />service. <br />3 <br />