Laserfiche WebLink
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2016 ATM <br />in replacing this High School HVAC system. This appropriation will fund the next step in the process. <br />This Committee unanimously recommends approval. <br />Project Description <br />Amount <br />Requested <br />Funding <br />Source <br />Committee Recommends <br />(d) Municipal Building Envelope <br />and Systems <br />$187,329 <br />GF (Cash) <br />Approval (5 -0) <br />"This ongoing capital request, originally approved for funding in the 2006 Proposition 2 1/2 Override, <br />includes repair /replacement projects for the maintenance and upgrade of municipal buildings and systems. <br />Repairs to roofs, windows, mechanical and electrical systems, and interior finishes are required on a <br />continual basis to maintain town facilities for their intended function. The public building infrastructure <br />will always need to be maintained, repaired, and upgraded to prevent structural deterioration and avoid <br />safety hazards. The projects within this program do not increase the size of the public building stock and <br />therefore do not result in increased utility usage or maintenance costs. This year's request intends to <br />implement extraordinary repairs at Cary Memorial Library, including the south entrance door system and <br />improvements to mitigate large amounts of ice dams that form during the winter season." <br />[Brown Book, Page XI -17] <br />Project Description <br />Amount <br />Requested <br />Funding <br />Source <br />Committee Recommends <br />(e) Building Flooring Program <br />$150,000 <br />GF (Free <br />Cash) <br />Approval (5 -0) <br />"This is a multi -year project that will replace carpet, vinyl tile, and ceramic tile flooring systems are <br />beyond their useful life. Flooring systems must be replaced periodically to insure the surfaces are safe and <br />cleanable. Worn or broken flooring creates a tripping hazard, can provide harborage for bacteria and <br />water, and is difficult to clean. Smaller repairs of flooring components are funded through the operating <br />budget. This is the seventh year of this program and new flooring systems have been installed in Clarke <br />stairwells, classrooms, and auditorium, Hastings main corridor, Diamond School, and Central <br />Administration and LHS. In FY 2017, flooring systems in Cary Memorial Library will be replaced at a <br />value of approximately $50,000, in coordination with a planned renovation of interior spaces. <br />Replacement of additional spaces will be prioritized in the spring of 2016." <br />[Brown Book, Page XI -17] <br />Project Description <br />Amount <br />Requested <br />Funding <br />Source <br />Committee Recommends <br />(f) Public Facilities Bid Documents <br />$100,000 <br />GF (Free <br />Cash) <br />Approval (5 -0) <br />"This is an annual request for funding of professional services to produce design development, <br />construction documents, and/or bid administration services for smaller school projects in anticipation of <br />requests for construction funding at town meeting that that have a high probability of approval. This will <br />insure that the projects can be completed in the then - current construction season, which is particularly <br />important for the timely completion of such projects given the short window between the end of school in <br />June and the beginning of school the following August." <br />[Brown Book, Page XI -18] <br />54 <br />