Laserfiche WebLink
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2016 ATM <br />successfully reconfigured through the doubling of the number existing access points at all three schools <br />and through the replacement of existing wireless access points by more powerful units at the high <br />school. However, additional work is needed to be done in order to handle the geometric growth in the <br />use of mobile technology at the schools over the last several years as well as for the need to handle <br />other technology devices such as VOIP phone systems. Accordingly, money is requested to (1) upgrade <br />the backbone to 10GB from the district head -end to Fiske, Bridge, Bowman, Harrington, and Hastings <br />($105,000), (2) upgrade the connections at Clarke and Diamond between the main network cabinets <br />(MDF) and the secondary network cabinets (IDF) and ($55,000), and (3) install the necessary <br />technology system in order to upgrade to Active Directory for all users ($18,000). <br />• Interactive Projector /Whiteboards Units - $90,000 is requested allow the Lexington School <br />District to replace SMART interactive projection systems and existing ceiling projector systems <br />purchased 2009 and earlier with replacement projectors and interactive projectors. Current units have <br />come to end of life and need to be replaced. Twenty -two classrooms grades 3 -12 require such <br />replacement units. The request will also allow us for the installation of new units in three High School <br />rooms without such units in place. During the last fiscal year, the school district completed a four year <br />process of equipping nearly all Grade 3 through 12 classrooms with interactive projector /whiteboard <br />units." <br />[Brown Book, Page XI -9 & 16] <br />Article 14: Appropriate <br />for School Zone <br />Traffic Calming <br />(Citizen Article) <br />Funds Requested <br />Funding <br />Source <br />Committee Recommends <br />N/A <br />N/A <br />Indefinite Postponement <br />(5 -0) <br />"To see if the Town will vote to raise and appropriate a sum of money for the purpose of purchasing and <br />installing flashing school zone traffic calming mechanisms in order to reduce vehicular speeding, increase <br />driver awareness, and improve pedestrian and bicyclist safety around school grounds, namely Bowman, <br />Bridge, Estabrook, Fiske, Harrington, Hastings, Clarke and Diamond; determine whether the money shall <br />be provided by the tax levy, by transfer from available funds or by any combination of these methods; or <br />act in any other manner in relation thereof. <br />"DESCRIPTION: Safe Routes To School proposes the installation of flashing school zone traffic calming <br />mechanisms similar to those used in Winchester and Woburn. Their purpose is to reduce vehicular <br />speeding, increase driver awareness, and improve pedestrian and bicyclist safety around school grounds <br />for Lexington's 6925 public school students." <br />[Town Warrant, Page 15] <br />An appropriation is no longer going to be requested. <br />Article 15: Appropriate <br />for Public Facilities <br />Capital Projects <br />Funds Requested <br />Funding Source <br />Committee Recommends <br />$1,878,249 <br />$974,400 GF (Debt) <br />+$636,520 GF (Free <br />Cash) + $267,329 <br />GF (Cash) <br />See Below <br />52 <br />