Laserfiche WebLink
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2016 ATM <br />Project Description <br />Amount <br />Requested <br />Funding <br />Source <br />Committee Recommends <br />(b) Pump Station Upgrades <br />$800,000 <br />Wastewater EF <br />(Debt) <br />Approval (5 -0) <br />"This is an ongoing program for upgrade of the stations including bringing them in compliance with <br />federal (OSHA) regulations, equipment replacement and generator installations. Lexington has 10 Sewer <br />pumping stations valued at over $6 million. In July 2013 a detailed evaluation and capital plan was <br />developed for the town with the assistance of Wright- Pierce. This includes a detailed engineering survey <br />of the pumps stations to determine current and future needs as well as a time table and probable costs for <br />the proposed work. FY17 funding is requested for full pump station replacement which will likely be used <br />for the Marshall Road Pump Station as shown in year 4 of the Capital Improvement Plan developed by <br />Wright- Pierce. Installation of back -up generators at Concord Avenue and Potter Pond pump stations as <br />well as other upgrades at Potter Pond have recently been completed and significant improvements to the <br />main pump station are underway that include HVAC upgrades, the installation of variable frequency <br />drives on all the pumps to minimize wear and tear, save energy and eliminate hammering in the force <br />main, and the installation of a surge tank." <br />[Brown Book, Page XI -11] <br />Article 13: Appropriate <br />for School Capital <br />Projects and <br />Equipment <br />Funds Requested <br />Funding Source <br />Committee Recommends <br />$1,384,087 <br />$427,607 GF (Debt) <br />+ $956,480 GF <br />(Free Cash) <br />Approval (5 -0) <br />Project Description <br />Amount <br />Requested <br />Funding <br />Source <br />Committee Recommends <br />(a) System Wide School Furniture, <br />Equipment and Systems <br />$186,087 <br />GF (Free Cash) <br />Approval (5 -0) <br />"The School Department submits annual requests for replacement of classroom and office furniture that <br />has reached the end of its useful life. The FY17 request will support new furniture for increased <br />enrollment and staff and additional classroom space for Lexington Children's Place. <br />"The FY17 Furniture, Equipment and Systems Replacement Program includes requests for: <br />• Student, Teacher and Staff Desks and Chairs <br />• Additional Classroom Furniture and Equipment for Lexington Children's Place <br />• Principal's Office furniture at Harrington <br />• Cafeteria Tables <br />• Bookshelves <br />• Activity Tables <br />• Stand -Up Student Desks <br />• Corkboard/ Markerboards <br />• Stools <br />• Supply Cabinets <br />• Computer Tables <br />50 <br />