Laserfiche WebLink
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2016 ATM <br />Minuteman Bikeway' which was completed with the cooperation of the Bicycle Advisory Committee and <br />representatives from the towns of Arlington and Bedford." <br />[Brown Book, Page XI -23] <br />This request will fund the purchase and installation of "wayfinding," intersection (street information) and <br />etiquette signage for solely the Lexington portion of the Minuteman Bikeway. This funding request will <br />not be used to promote privately -owned commercial entities/businesses. <br />The one member's opposition to this request is based on two concerns: 1) This project will not have <br />continuity with Bikeway signage in Arlington and Bedford as those communities have not formally <br />agreed to use the same designs along their portions of the Bikeway, and 2) The need for these amenities in <br />a time of significant fiscal pressures. <br />roject Description (CPA Category) <br />Amount <br />Requested <br />Funding <br />Source <br />Committee Recommends <br />(j) Town Pool Renovation Design <br />and Engineering Costs (Recreation) <br />$166,000 <br />CPF (Cash) <br />Approval (5 -0) <br />"This request will partially fund Phase III of a multi -phase renovation program to the Irving H. Mabee <br />Pool Complex. Phases I and II (approved in 2010 and 2011) are complete. The FY17 request seeks <br />funding to determine the design and engineering costs for replacement of the existing filtration system <br />and additional work required to ensure the successful operation of the pool complex. It is expected that a <br />subsequent FY18 request will fund the construction and implementation of the proposed Phase III <br />upgrades." <br />[Brown Book, Page XI -19] <br />roject Description (CPA Category) <br />Amount <br />Requested <br />Funding <br />Source <br />Committee Recommends <br />(k) Park Improvements —Hard <br />Court Resurfacing (Recreation) <br />$61,000 <br />CPF (Cash) <br />Approval (5 -0) <br />"The FY17 request is for $61,000 to rehabilitate the basketball courts at Rindge Park and Kineens Park. <br />This project will include reconstruction of the courts and installation of new backboards and poles. The <br />current surfaces have extensive cracks and frost heaves which require reconstruction. It will also include <br />funding to purchase and permanently install a bike rack at each site." <br />[Brown Book, Page XI -24] <br />Project Description (CPA Category) <br />Amount <br />Requested <br />Funding <br />Source <br />Committee Recommends <br />(1) Granite Forest Pocket Park <br />Construction at Lincoln Park <br />(Recreation) <br />$30,000 <br />CPF (Cash) <br />Disapproval (5 -0) <br />"This project proposes construction of a pocket park within Lincoln Park, creating a greenway corridor <br />that will connect the lower park to the upper park. The request for $30,000 in CPA funds would <br />supplement $45,000 in private donations raised by the Lincoln Park Sub- Committee. Design plans call <br />for the installation of granite benches and fixtures and 11 granite pieces donated from the site of the Isaac <br />Mulliken House will be utilized for that purpose." <br />[Brown Book, Page XI -25] <br />This was presented as a private project, which has not previously been part of the Town's Capital Plan <br />and the proponent has adequate resources to provide the final increment of needed funding. This <br />Committee unanimously opposes this request. <br />37 <br />