Laserfiche WebLink
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2016 ATM <br />LPS currently own and operate six elementary- school buildings, two middle - school buildings, and the <br />high- school complex of four, freestanding, academic buildings and a field house. Central Office <br />( "Administration ") personnel and services are located in what had been the old Harrington School. In <br />addition, the old Harrington houses elements of the Lexington, Arlington, Burlington, Bedford, Belmont <br />(LABBB) Collaborative and LPS Pre -K programs. The maintenance of those fourteen buildings is <br />overseen by the DPF. <br />Perhaps the most important capital issue facing LPS is the fact that the school system has an enrollment in <br />Pre -K through middle school that is over the system capacity, so the increasing enrollment presents a <br />growing pressure on the schools from a building - capacity perspective. <br />• Pre -K: Currently there is no plan to add additional capacity to address the growing needs at the <br />Pre -K level. <br />• Elementary Schools: To partially address the current overcrowding at the Elementary level, the <br />LPS will be adding six modular classrooms: two each to Bowman, Bridge, and Fiske schools. In <br />addition, the LPS desires to replace the current 21- classroom Maria Hastings School with a new <br />30- classroom school at a cost of approximately $60 million, gaining nine additional classrooms. <br />The MSBA will partner with Lexington to provide approximately 30% of the cost. It should be <br />noted that this plan is not expected to fully alleviate the overcrowding in the elementary schools. <br />Currently in grades K -5 LPS have taken art, music and other space to form 10 classrooms beyond <br />the designed capacity of the set of K -5 schools. Even with these added classrooms there is <br />expected to be a need for another 6 -12 classrooms to eliminate the overcrowding, by the start of <br />the 2019 -2020 school year, depending on whether or not the modular classes are removed when <br />Hastings comes on line and based on the median enrollment projection. <br />• Middle Schools: The School Committee also desires to do extensive renovations to the Clarke <br />and Diamond Middle schools, gaining capacity for 3.5 teams (with a planning capacity of <br />86 students /team) at a cost of about $67M (See this Committee's separate report to the <br />March 21, 2016, STM 2016 -3, Article 2). This is expected to accommodate the median <br />enrollment projections out to the 2019/2020 school year (and likely to 2020/2021). <br />While capital projects for the LPS buildings and their environs are managed by the DPF, there are often <br />requests for capital appropriations directly managed by LPS in the following four areas. <br />School Technology Program <br />There is a long -term plan to upgrade technology throughout the schools by replacing the oldest <br />computers, peripherals, projection systems, network- delivery systems, and other associated hardware and <br />software to use as enhanced instructional and administrative tools. (See Article 13(b)) <br />Classroom and Administrative Furniture <br />On an annual basis the school department replaces and/or repairs old or outdated furniture such as student <br />and teacher desks, chairs, tables, filing cabinets and other basic furnishings. In addition to classroom and <br />office furnishings, other system -wide furnishings include conference and cafeteria tables, bookshelves, <br />and storage units. In FY2016, a District Furniture Assessment Analysis was funded that will provide <br />important insight into the on -going management of that expensive asset base, provide for enhanced reuse <br />and/or repair of existing furniture, and help tailor new requests to the minimum quantity, type, and costs <br />of furniture that is needed to support the educational programs. While the initial results of that analysis <br />are not yet in hand, there is an FY2017 request for needed furniture. (See Article 13(a)) <br />Food - Service Equipment <br />Food - service operations in all schools serve hot and cold meals to thousands of students each school day. <br />It is essential to purchase and maintain equipment for preparing and maintaining cooked items and that <br />provides for safe distribution. The food - service operations are contracted to a private vendor, but the <br />purchase of equipment is the responsibility of the school system. To the extent practical, such purchases <br />28 <br />