Laserfiche WebLink
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2016 ATM <br />(Fire Department 5 -Year Capital Appropriation History has been combined with the Police Department <br />History as many appropriations are for the joint benefit of both Departments. That combined <br />Public - Safety History is after the following Police Department narrative.) <br />Police <br />The Lexington Police Department (LPD), which provides public safety services through a team of <br />dedicated police officers, detectives, dispatchers and support staff, is supported by the Town's Capital <br />Program in the areas of communication systems, computer systems, and improvements to the facilities in <br />which it is housed and trained. <br />The FY2017 Capital Budget contains one joint request with the Fire Department. (See above). A new <br />firing range at the Hartwell Ave compost site has been contemplated for several years in order to meet <br />current firearms training requirements and the needs of modern police work, as well ensuring readiness to <br />respond to weapons currently on the streets — $50,000 of D &E was appropriated last year toward <br />development of a new facility. This Committee looks forward to the results of that study and the follow - <br />on request for construction — currently expected in FY2018. <br />With regard to a renovation and add -on to the existing Police Station located at 1575 Massachusetts <br />Avenue, the Town's planning now has the D &E funding in FY2019, with construction funding in <br />FY2020 —each a year earlier than the scheduling of the TBDs when the Brown Book was published. This <br />Committee's capital plan uses that same, latest, scheduling. Beyond correcting very basic needs due to <br />overcrowding and functional inadequacy, the renovation of the police station will include other necessary <br />enhancements. For instance, the Police Department must substantially improve its ability to process <br />fingerprints with a larger fuming tank and replacement of the smaller tank. (Standing alone, these costs <br />would exceed $25,000.) Because this upgrade requires a larger lab and building design to support the use, <br />it will be incorporated into the Police Station renovation project. <br />The Federal Government has mandated that public -safety agencies (including Lexington's Police and Fire <br />Departments) will be required to move their radio -band frequency from the current 400 band, to the 800 <br />band. This will require a complete replacement of radio equipment, including hand held, mobile, and base <br />stations. The radio system was upgraded and changed in 1994, at a cost of over $1 million. A change to <br />the new frequency band will be a capital project affecting both the Police and Fire Departments. The <br />departments are currently studying how best to comply with the new mandates. Cost estimates will follow <br />once the scope and timing of the project is clearly defined. <br />Public- Safety Departments 5 -Year Capital Appropriation History (All <br />Sources) (Combines Fire & Police Department Appropriations) <br />(Police Department 5 -Year Capital Appropriation History has been combined with the Fire Department <br />History —hence this Public - Safety Departments History —as many appropriations are for the joint benefit <br />of both Departments.) <br />Library <br />In December 2010, architects Adams and Smith were hired to study how operations at the Main Library <br />could be improved ($25,000 under 2010 ATM, Article 12(q)). Funding of $100,000 for recommended <br />changes was approved under 2011 ATM, Article 13(1). The recommendations include changes to <br />workflow and ergonomics. Under 2013 ATM, Article 10(b), $124,000 was appropriated to purchase <br />16 <br />FY2012 <br />FY2013 <br />FY2014 <br />FY2015 <br />FY2016 <br />Fire Trucks & Ambulances <br />$240,000 <br />$485,000 <br />$250,000 <br />$500,000 <br />Firefighter Protection Turnout Gear <br />$88,000 <br />Public Safety Radio Connectivity <br />$50,000 <br />Public Safety Radio Stabilization <br />$90,000 <br />Heart Monitor <br />$105,000 <br />Police /Fire Dispatching & Records Software <br />$709,500 <br />Totals <br />$328,0001 $50,000 <br />$485,0001 $355,000 <br />$1,299,500 <br />(Police Department 5 -Year Capital Appropriation History has been combined with the Fire Department <br />History —hence this Public - Safety Departments History —as many appropriations are for the joint benefit <br />of both Departments.) <br />Library <br />In December 2010, architects Adams and Smith were hired to study how operations at the Main Library <br />could be improved ($25,000 under 2010 ATM, Article 12(q)). Funding of $100,000 for recommended <br />changes was approved under 2011 ATM, Article 13(1). The recommendations include changes to <br />workflow and ergonomics. Under 2013 ATM, Article 10(b), $124,000 was appropriated to purchase <br />16 <br />