Laserfiche WebLink
TOWN OF LEXINGTON <br />Permanent Building Committee <br />Permanent Members <br />Jon Himmel, Co-Chairman, Charles Favazzo, Co-Chairman, <br />Peter Johnson, Philip Coleman, Celis Brisbin, Elizabeth Giersbach, Frederick Merrill <br />Police Station Members: Semoon Oh, Wendy Krum <br />Associate Members: Curt Barrentine, Henrietta Mei <br /> <br />PBC Minutes for the meeting held on: 1-12-23 <br />Meeting was held remotely via Zoom <br /> <br />Members Present: <br />Jon Himmel, Charles Favazzo, Phil Coleman, Celis Brisbin, Elizabeth Giersbach, Fred Merrill, Wendy Krum, Curt <br />Barrentine, Henrietta Mei <br /> <br />The PBC Meeting was called to order at 5:00pm <br /> <br />Meeting Minutes <br />The minutes for 10-25-22 Meeting were distributed earlier in the week. A few edits were discussed and will be <br />corrected in the minutes. <br /> <br />Westview Update <br />DPF provided an update on the Westview Project. <br />Roofing is tight to the edge and exterior wall openings have been covered in poly in the admin building. Mason is <br />continuing and those areas of work are being tented and heated as necessary. Plumbing rough is 70% and Masonry <br />work is 95%. Interior framing at Admin buildings is complete. <br />HVAC rough, Electrical rough, electrical secondary and overhead door framing at openings will all take place over the <br />next several weeks. <br /> <br />Police Update <br />DPF provided an update on the Police Project. <br />All Demo and hazardous removal work are complete. <br />Excavations and footings / foundation work is ongoing. <br />Oil found in soil near area where a UST was removed in 2017. <br />Soil tests are being evaluated currently. DPF advised that borings were being performed the next day with PID readings <br />to measure extent of any further contaminants. (*The day after this meeting DPF notified the PBC that PID test were as <br />expected and no further excavations or soil removals would be required). <br />For upcoming work, the first Steel sequence is arriving in February, with the overall sequence plan is 2/3/23 thru <br />3/30/23 <br />Under slab utilities start in April 2023 <br /> <br />A question was asked about availability of electrical items such as panels and switch gear. <br />DPF advised that they are not aware of any materials delays at this time. DPF understands that the majority of electrical <br />equipment for Westview is already in hand. For the Police project long lead items are being tracked, but again no know <br />serious delays expected. <br /> <br />It was asked if weather protection was included in the specs. DPF advised that the specifications do include specific <br />weather controls for construction activities. <br /> <br />Update on School Building Committee Meeting <br />The previously scheduled School Building Committee meeting was canceled and will be re-scheduled. Although there <br />was some brief discussion on the completion of the Enrollment Certification, which was executed between the School <br />Department and the MSBA. The final agreed upon Design Enrollment (DE) for the High Scholl is 2,395 students. <br />