The Historic District Commission and Select Board approved moving the Hosmer House to an alternate <br /> location within Lexington,prior to commencement of the Police Station construction project.The Hosmer <br /> House was moved in November 2022 by a private party and relocated to Blossomcrest Road where it is <br /> being redeveloped as a home <br /> Lexington Fire Department Headquarters <br /> Construction Start Date:November 2018 <br /> Project Completion Date:October 2020 <br /> Project Budget:$19,943,700 <br /> Funding: STM 12017 Article 2/ STM 4 2017 Article 4/ATM 2018 Article 13 <br /> The Town has completed the installation of a 41.7 kW solar energy system on the roof of the Fire Station. <br /> Old Reservoir Bath House Renovation <br /> Appropriation: $620,000 <br /> Funding: ATM 2019 Article 14g <br /> All initial bids received by the Town exceeded the appropriation approved by Town Meeting. The <br /> Department of Public Facilities and Recreation Department staff have developed procurement alternatives <br /> required to complete the project. Final engineering work is being completed now with the expectation that <br /> the project will be advertised for bid this spring. If those bids are within appropriation, the construction <br /> project is expected to begin this fail. <br /> Center Bathroom &Maintenance Building Renovation <br /> Appropriation: $1,180,000 <br /> Funding: ATM 2020 Article 16b / ATM 2021 Article 16g/ ATM 2022 Article 10e/ STM 2022-3 Article 5 <br /> 2020 Annual Town Meeting approved $100,000 in design and engineering funds for the Center Bathroom <br /> building renovation project. At the 2021 Annual Town Meeting,the Select Board recommended <br /> indefinite postponement of warrant article 16g requesting$915,000 in construction funding to a future <br /> Town Meeting. 2022 ATM approved warrant article 10e requesting$680,000 in additional funding for <br /> this project. STM 2022-3 approved warrant article 5 requesting$400,000 in additional funding for this <br /> project. <br /> The Town recently received a successful general contractor bid of$815,000 for this project. A meeting <br /> with the contractor,Recreation Department and DPW staff has been set to establish the construction <br /> schedule. The project is expected to take 6 months to complete. <br /> Lexington High School Feasibility Study <br /> Appropriation:$1,825,000 <br /> Funding: STM 2022-2 Article 2 <br /> The Massachusetts School Building Authority(MSBA) invited Lexington to participate in the MSBA's <br /> eligibility period for the Lexington High School in March 2022. Lexington has formed a School Building <br /> Committee to manage the MSBA process for the Lexington High School Project. The Town completed <br /> the preliminary requirements defined by the MSBA. Lexington received our design enrollment <br /> certification from the MSBA stating that the Lexington High School proposed project will be based on an <br /> enrollment of no more than 2,395 students in grades 9-12. <br /> On March 1,2023,the Lexington High School project was invited by the MSBA Board of Directors into <br /> the next Module,the Feasibility Study. The School Building Committee will partner with the MSBA on <br /> 6 <br />