Laserfiche WebLink
Minutes of the Lexington Zoning Board of Appeals <br />Virtual, Via Zoom <br />December 8, 2022 <br /> <br />Board Members: Chair – Ralph D. Clifford, Martha C. Wood, Norman P. Cohen and James <br />Osten <br /> <br />Administrative Staff: Jim Kelly, Building Commissioner Julie Krakauer Moore, Zoning <br />Administrator and Sharon Coffey, Administrative Clerk <br /> <br />Address: 915 Waltham St <br /> <br />The petitioner is requesting a total of FIFTEEN (15) SPECIAL PERMITS in accordance with the <br />Zoning By-Law (Chapter 135 of the Code of Lexington) section(s) 135-5.2.8.3 to allow the <br />existing standing sign to be reinstalled after construction is complete; THREE (3) SPECIAL <br />PERMITS section 135-5.2.8(1) to allow for three additional secondary signs beyond the <br />permitted two secondary signs;135-5.2.8(1) to allow for the principal wall sign to be larger than <br />otherwise permitted; FIVE (5) SPECIAL PERMITS section 135-5.2.8(1) to allow for five <br />secondary wall signs to be larger than otherwise permitted; 135-5.4.4 to allow light trespass; <br />and FOUR (4) SPECIAL PERMITS section 135-5.2.4 to allow for the internal illumination of <br />signage. <br /> <br />The petitioner submitted the following information with the application: Nature and Justification, <br />Plot Plan, Plans. Also submitted was a Narrative and a letter from the Design Advisory <br />Committee Letter. <br /> <br />Prior to the meeting, the petitions and supporting data were reviewed by the Building <br />Commissioner, Conservation Administrator, Town Engineer, Board of Selectmen, the Planning <br />Director, the Historic District Commission Clerk, Historical Commission, Economic <br />Development, and the Zoning Administrator. Comments were received from the Zoning <br />Administrator, Building Commissioner, Conservation Department and Engineering Department. <br /> <br />Presenter: John Farrington, attorney at 35 Blair Ln West Falmouth, on behalf of Colbea <br />Enterprise LLC <br /> <br />The Hearing was opened at 830 pm. <br /> <br />John Farrington presented the petition. He stated they are requesting special permits for <br />signage and lighting. He discussed the lot history. He state the presentation will focus on <br />existing, proposed and addressing the special permits. They will address the comments from <br />the Design Advisory Committee. The signage and lighting will be a continuation of what <br />currently is there. <br /> <br />Sheryl Guglielmo, LEED AP Senior Project Manager, reviewed the Special permits requested <br />one by one. She stated the existing main sign is internally illuminated. They propose to allow for <br />that to be removed and reinstalled after construction to protect the sign. No changes will be <br />made. <br /> <br />A Board Member, Nyles N. Barnert, questioned if the Design Advisory Committee recommend <br />this sign no longer be internally illuminated (The memo states no internal illumination of the <br />grocer rewards panel or the Dunkin sign). <br /> <br />