Laserfiche WebLink
● Peggy will share documents from previous assignments (from Tool <br />Design) <br />● Richard Canale - Signs should work/reinforce with each other (Mass <br />Ave vs. Bikepath, Minuteman Bikeway vs. Battleroad Byway, <br />Streetscape vs. Battleroad Byway, Streetscape vs Minuteman <br />Bikepath) - Should Town look into this? Richard to talk to Sandhya <br /> <br />4. Signage: <br />● Signage on Minuteman Bikeway - Who owns it? Economic <br />Development? Dave Pinsonneault DPW? <br />● Kiosks? Interpretive signs? - Money is already there (CPA Money) - <br />Should work with Economic Development (Sandhya) so it is a <br />collaborative effort <br />● Peggy displayed Messages from other towns. Cost: 2 messages on 1 <br />sign - approx $150/sign + post + installation <br />● Suzie - Sign making machine is that possible? No, says Peggy. Suzie <br />will check. <br />● ACTION: (COMPLETE) Betty will contact Dave Pinsonneault to <br />schedule a meeting. Mike, Jim, Ross, Peggy, Sandhya, Richard, Betty <br />to meet to discuss how to work together - so that all these signage <br />projects are coordinated. <br />○ Betty, Peggy, Dave Armstrong, David Pinsonneault, Ross, <br />Sandhya Iyer, Casey Haggerty and the consultant met on Sept <br />21st to review the East Lexington signage design and discuss <br />funding for the kiosks and 8 interpretive signs. <br /> <br />5. Bike/Ped Plan Update - TSG - Ram to email draft Bike/Ped Plan RFP doc to <br />committee for review. Sheila Page plans to issue the RFP for vendors by the end of <br />September. <br /> <br />6. Comprehensive Plan Transportation Goals Update - Dave