|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2022-09-15-LBAC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Lexington Bicycle Advisory Committee-LBAC
>
Minutes
>
2022
>
2022-09-15-LBAC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2023 6:39:58 PM
Creation date
11/7/2022 12:35:59 PM
Metadata
Fields
Template:
Archives
Year
2022
Department
Town Clerk
Keywords or Subject
Minutes - LBAC - Lexington Bicycle Advisory Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
● Peggy will share documents from previous assignments (from Tool <br />Design) <br />● Richard Canale - Signs should work/reinforce with each other (Mass <br />Ave vs. Bikepath, Minuteman Bikeway vs. Battleroad Byway, <br />Streetscape vs. Battleroad Byway, Streetscape vs Minuteman <br />Bikepath) - Should Town look into this? Richard to talk to Sandhya <br /> <br />4. Signage: <br />● Signage on Minuteman Bikeway - Who owns it? Economic <br />Development? Dave Pinsonneault DPW? <br />● Kiosks? Interpretive signs? - Money is already there (CPA Money) - <br />Should work with Economic Development (Sandhya) so it is a <br />collaborative effort <br />● Peggy displayed Messages from other towns. Cost: 2 messages on 1 <br />sign - approx $150/sign + post + installation <br />● Suzie - Sign making machine is that possible? No, says Peggy. Suzie <br />will check. <br />● ACTION: (COMPLETE) Betty will contact Dave Pinsonneault to <br />schedule a meeting. Mike, Jim, Ross, Peggy, Sandhya, Richard, Betty <br />to meet to discuss how to work together - so that all these signage <br />projects are coordinated. <br />○ Betty, Peggy, Dave Armstrong, David Pinsonneault, Ross, <br />Sandhya Iyer, Casey Haggerty and the consultant met on Sept <br />21st to review the East Lexington signage design and discuss <br />funding for the kiosks and 8 interpretive signs. <br /> <br />5. Bike/Ped Plan Update - TSG - Ram to email draft Bike/Ped Plan RFP doc to <br />committee for review. Sheila Page plans to issue the RFP for vendors by the end of <br />September. <br /> <br />6. Comprehensive Plan Transportation Goals Update - Dave
The URL can be used to link to this page
Your browser does not support the video tag.