Laserfiche WebLink
ARTICLE 5 <br /> Project: Center Recreation Complex Bathrooms & <br /> Maintenance Building Renovation— Supplemental <br /> Funding <br /> CPA Category: Recreation <br /> Amount Requested: $400,000 <br /> Amount Recommended: $400,000 <br /> CPC Vote: (9 - 0 <br /> Project Description: <br /> This FY 23 supplemental funding request will fund the construction and renovation of the Center <br /> Recreation Complex bathrooms and DPW Maintenance building. 2022 Annual Town Meeting <br /> originally authorized $680,000 under Article 10(e) for the construction phase of this project; <br /> however, economic conditions have increased all associated construction materials and labor <br /> costs, causing all submitted bids to exceed the original estimated cost of the project. These <br /> increased construction costs, coupled with the associated"soft costs" of contingencies, <br /> construction testing, network infrastructure, legal, RCN services and architects' fees, will cause <br /> the total project cost to equal approximately $1,080,000. <br /> The main areas of this renovation will focus on increasing safety through a modified layout, <br /> converting two large communal bathrooms into six individual restrooms and improving DPW <br /> maintenance needs for the entire property. Of the six renovated bathrooms, two will be family <br /> facilities that are fully accessible. This project includes repairs to the plumbing system and <br /> installation of all new fixtures, installation of new and improved lighting and the replacement of <br /> the existing roof as well as additional repairs and improvements to the maintenance building. <br /> Project Goals and Objectives: <br /> • Increase safety through a modified layout; <br /> • Install new and improved lighting to address safety concerns; <br /> • Provide a safe and accessible facility for all users; and <br /> • Prevent further deterioration. <br /> Project Benefit: <br /> The renovations will provide the community with accessible restrooms and maintenance space to <br /> create more efficiencies in maintaining the park. The renovation will support the Town goals for <br /> increased Diversity, Equity and Inclusion by providing six individual restrooms, two of which <br /> will be accessible. Additionally, it will increase access to public restrooms, which is a Town <br /> deficiency throughout the park system and community overall. <br /> Funding Request: The FY23 supplemental request is $400,000. <br />