Impact if Not Completed: <br />The regular replacement of the synthetic turf system of the fields at Lincoln Park is simply an ongoing maintenance <br />issue that must occur approximately every 10 years to maintain the safety and playability of the fields. If the <br />synthetic turf system is not replaced at its end -of -life, the field will not meet safety standards and will ultimately <br />have to be closed. <br />The deferral of the turf replacement at Lincoln Field #1 by a year will push the replacement schedule for the other <br />two fields back by a year and would result in at least one year, and possibly two years, during which a field at <br />Lincoln would be offline concurrent with disrupted usage of fields at Center Recreation Complex. Such concurrent <br />field losses would have major repercussions for the many field users in Lexington. <br />The installation of athletic lighting at Lincoln Field #1 is necessary to optimize the usage of the existing field space <br />in Lexington and to begin to reduce the deficit between desired and available field usage. Failure to install lighting <br />at Lincoln Field #1 will mean at best that we will continue to be unable to support the recreational needs of the <br />community and at worst will face significant further reduction in field availability for the several years of a LHS <br />building project. <br />Timeframe: <br />FY2024: synthetic turf system replacement and athletic lighting installation at Lincoln Field #1 and athletic lighting <br />installation at Lincoln #3 (est. $3,391,500) <br />FY2025: synthetic turf system replacement at Lincoln Field #2 (est. $1,484,000) <br />FY2026: synthetic turf system replacement at Lincoln Field #3 (est. $1,544,100) <br />Replacement Frequency: <br />10 years <br />Basis for Cost Projections: <br />Cost projections are based on similar past projects and information provided by vendors and architects in September <br />2022. The synthetic turf, pad, and infill are not part of the CPA request. All cost estimates are provided in then - <br />year dollars (FY2024 request in FY2024 dollars, FY2025 request in FY2025 dollars, and FY2026 request in <br />FY2026 dollars). <br />Stakeholders: Residents, Abutting Residents, Recreation & Community Programs, Recreation Committee, <br />Lexington High School Physical Education Program, Lexington High School Athletics, numerous community users <br />including Lexington United Soccer Club (LUSC) and Lexington Youth Lacrosse (LYL). <br />Operating Budget Impact: <br />DPW staff hours, equipment, and materials costs should decrease with improved field conditions that will require <br />routine maintenance and not emergency repairs. <br />Funding Source: Cash Capital, Bonding, CPA, <br />Prior Authorizations: <br />Town Meeting Description Authorized <br />2013/81-1 Lincoln Park Field Improvements $ 565,000 <br />2014/8H Lincoln Park Field Improvements $ 620,000 $ <br />Expended Encumbered Remaining Returned <br />564,999 $ — $ — $ 1 <br />616,521 $ — $ — $ 3,479 <br />2015/8M Lincoln Park Field Improvements $ 650,000 $ 649,968 $ — $ — $ 32 <br />Totals $ 1,835,000 $ 1,831,488 $ — $ — $ 3,512 <br />Recreation - Page 13 Printed October 10, 2022 <br />