Work Currently Underway: <br />The FY2022 funded design and engineering for the I" and 2nd fairway drainage repair is in progress (project planned <br />for FY25). The FY23 funded projects are tentatively scheduled for completion Fall 2022 -Spring 2023. <br />Planned Spending for Next 5 Years: <br />FY2025: $350,000 - Complete the drainage improvements on the 1st and 2nd fairways and renovate the cart path <br />on the 5th hole. The design and engineering phase for the drainage improvements and the 5th cart path <br />enhancements will be completed in FY2023. <br />FY2026: $75,000 - Replacement of the fuel bays and renovate the practice area and replace safety netting. <br />FY2027: $100,000 - Reshape the 2nd green (which will involve stripping the sod, shaping the green, and replacing <br />the existing sod), extend the 3rd fairway to the left and install irrigation, and complete a new Master Plan (replacing <br />the 2006 Master Plan, which is substantially complete). <br />Basis for Cost Projections: <br />The cost is based on an estimate provided by a golf course architect in September 2022. All cost estimates are <br />provided in then -year dollars (FY2024 request in FY2024 dollars, FY2025 request in FY2025 dollars, FY 2026 <br />request in FY2026 dollars, FY2027 request in FY2027 dollars, and FY2028 request in FY2028 dollars). <br />Stakeholders: Residents, Non -Residents, Recreation & Community Programs, Recreation Committee, DPW, <br />Lexington High Golf Teams, Minuteman High School Golf Teams, and the Conservation Commission <br />Operating Budget Impact: <br />A reduction in revenue if the fairways, greens, and tee boxes are not playable. <br />Funding Source: Recreation <br />Prior Authorizations: <br />Town Meeting Authorized Expended Encumbered Remaining Returned <br />2016/9 <br />$ <br />65,000 <br />$ <br />64,677 <br />$ - $ <br />- $ 323 <br />2019/15A <br />$ <br />75,000 <br />$ <br />69,859 <br />$ - $ <br />- $ 5,141 <br />2021/11A <br />$ <br />25,000 <br />$ <br />9,917 <br />$ 14,720 $ <br />363 $ - <br />2022/11A <br />$ <br />95,000 <br />$ <br />5,500 <br />$ 81,996 $ <br />7,504 - <br />Totals $ <br />355,000 <br />$ <br />155,453 <br />$ 178,712 $ <br />15,371 $ 5,464 <br />Funding Request: <br />Recreation - Page 5 Printed October 10, 2022 <br />FY2024 <br />FY2025 <br />FY2026 <br />FY2027 FY2028 <br />Design/Engineer <br />$ 18,000 <br />$ 20,000 <br />$ <br />15,000 <br />$ 35,000 <br />Construction <br />$ 120,000 <br />$ 300,000 <br />$ <br />55,000 <br />$ 58,000 <br />Equipment <br />Contingency <br />$ 12,000 <br />$ 30,000 <br />$ <br />5,000 <br />$ 7,000 <br />Totals <br />$ 150,000 <br />$ 350,000 <br />$ <br />75,000 <br />$ 100,000 $ - <br />CPA Amount <br />$ - <br />$ - <br />$ <br />- <br />$ - $ - <br />Recreation - Page 5 Printed October 10, 2022 <br />