Laserfiche WebLink
RECREATION COMMITTEE: FY24-FY28 CAPITAL SUMMARY STATEMENT <br />In light of these considerations, the Recreation Committee FY2024-FY2028 5 -year capital plan <br />has revised since FY2023-FY2027 in an effort to 1) at least partially mitigate the acute impact of <br />the potential loss of athletic fields during a LHS building project and 2) take active steps toward <br />reducing the magnitude of the deficit in athletic field availability that exists in Lexington: <br />• revise the Lincoln Park Fields Capital Program to accelerate the turf renovation schedule <br />by one year to reduce the overlap between Lincoln Park field closure and potential loss of <br />Center Recreation Complex field usage resulting from a LHS building project: Field 41 <br />from FY2025 to FY2024; Field #2 from FY2026 to FY2025; Field #3 from FY2027 to <br />FY2026; <br />revise the Lincoln Park Fields Capital Program to include the installation of athletic <br />lighting at Lincoln Field #1 and Lincoln Field #3 in FY2024, which would yield up to 1600 <br />hours of additional field availability; <br />• revise the Athletic Fields Capital Program to include the development of a lighted, multi- <br />use synthetic field designed to provide 2 full-sized rectangular multi -sport fields, and <br />contained within them a full-sized cricket pitch, on the site of the Old Harrington School <br />(Option Harrington B in the Comprehensive Study of Athletic and Outdoor Recreation <br />Facilities 2021-2022), which would yield up to 4,600 hours of additional field availability. <br />The entire Recreation Committee 5 -year capital plan is outlined in the table immediately following <br />this summary statement and detailed in the backing sheets that comprise the remainder of this <br />document. For quick reference, following is a summary of the projects that the Recreation <br />Committee proposes for funding in FY2024. <br />For FY2024, the Recreation Committee proposes seven level -service capital projects/expenses <br />that maintain the recreation facilities and opportunities as currently enjoyed by the community: <br />#6201 <br />Pine Meadows Improvements (Grounds Maintenance) <br />$150,000 <br />#6203 <br />Pine Meadows Equipment (EOL Replacements) <br />$110,000 <br />Rec-24-1 <br />Pine Meadows Clubhouse Renovation (D&E) <br />$120,000 <br />Rec-24-2 <br />Lincoln Park Field Improvements (Field #1 & Field #3) <br />$3,391,5002 <br />Rec-24-3 <br />Pool Water Chemistry Automated Controller <br />$25,000 <br />Rec-CPA-1 <br />Park and Playground Improvements (Justin Park) <br />$155,000 <br />Rec-CPA-2 <br />Park Improvements — Athletic Fields (Bridge Field) <br />$285,000 <br />In addition to protecting and maintaining the quality of the current recreation infrastructure, the <br />Committee also seeks to be responsive to changing or emerging community needs. For FY2024, <br />2EOL synthetic turf replacement is a level -service project element comprising $1,451,500 of the total project cost <br />