Laserfiche WebLink
Study Background + Goals <br />The athletic field study was borne out of the Minuteman Sports <br />Complex venture not being approved. Ultimately citizens of <br />Lexington were unclear if the complex was needed based on <br />the available athletic facilities and current demand. <br />Goals: <br />■ Determine the benefit of installing sports lighting to <br />programming and field use <br />■ Optimize available fields for better use of space <br />through reconfiguration/ expansion <br />■ Prioritize safety <br />■ Evaluate the impact of installing additional synthetic <br />turf fields on field availability and condition <br />■ Evaluate/identify the need for purchasing a site for field <br />expansion or pursuing a public/private partnership <br />!T.r `� <br />.:3 ,F� R ^� <br />Weston ®Sampson <br />Town of . <br />exl n ton Athletic Field Stud 2022 <br />g y- <br />} A .mss <br />",""' s <br />Massachusetts Lexington, Massachusetts <br />