Laserfiche WebLink
c. Updates: NEASC Progress Report and DESE's New Programs Approval Process <br /> Steve Sharek referenced the April 25,2017 letter from NEASC,which was included in the packet, <br /> received in response to the recent Special Progress Report that Minuteman submitted at their request. He <br /> highlighted the good news,namely the vote to continue accreditation of Minuteman and to remove the <br /> school from warning status that was related to the physical condition of the building. The anticipated <br /> construction of a new school building,about to get underway,was noted in the NEASC letter as a reason <br /> to remove the school from warning status. <br /> Michelle Roche explained the process for submitting to DESE requests for new program approval. She <br /> noted that this is completed in two parts,A and B. She reported that the recent Minuteman submission of <br /> Part A for both Multi-Media Engineering and Advanced Manufacturing&Metal Fabrication,which <br /> included a needs survey, labor market analysis,and advisory board detail,were approved, and she is on <br /> deadline to submit details for Part B by this Friday. She explained that the expectation is that there will <br /> be some back and forth with DESE,as details are finalized, and she anticipates Minuteman will receive <br /> final approval by November, 2017. She noted the need to be very well-organized in the submission <br /> process and to observe DESE's protocols for written material that is submitted. School Committee <br /> member comments included the importance of submitting materials according to DESE's criteria to <br /> continue the success that has occurred in the past,and for the long-term benefit. The member from <br /> Lincoln expressed her interest in perusing the submitted materials. The Chair expressed that he shares <br /> Ms. Roche's excitement for the pending final approval. <br /> 7. PRINCIPAL'S REPORT <br /> a. Approval of 2017-18 Minuteman High School Calendar <br /> Mr. Dillon referenced the Draft 2017-18 Minuteman High School Calendar included in the packed, and noted two <br /> amendments: making April 13,2018 an early release day and changing the showcase day from November 14 to the <br /> 16th. He also noted that the MCAS dates have not yet been determined,but once received,this would be updated <br /> and circulated. Attendance on Good Friday,the possible impact of snow days, and that the time for the Sunday <br /> Career Day Open House,listed as TBA,is still under discussion,were other items raised. With no objection to the <br /> two articulated changes,the following vote was taken: <br /> ACTION 2017#31 <br /> Moved(Flood)and seconded(Leone) <br /> To approve the 2017-18 Minuteman High School Calendar,as presented and amended <br /> VOTE: 11 Members in room at time of vote (not Arlington,Weston,Dover,Boxborough, <br /> Sudbury) <br /> Weighted Vote present: 62.75 % <br /> Weight needed: >31.375 % <br /> Names of towns opposing or abstaining: none <br /> Final percentage results of vote: 62.75 % <br /> Final status of the vote: Passed Unanimously <br /> The approved calendar can be found as Attachment C. <br /> 8. SUBCOMMITTEE REPORTS <br /> a. Superintendent Negotiation and Evaluation Subcommittee (SNES) <br /> Superintendent's End of Cycle Evaluation Report(5.1.17) <br /> Mr. Horton explained that the materials related to this item were included in the packet and in some cases, <br /> references were made to where additional data can be found. He explained the process for members to <br /> provide their input via the Survey Monkey instrument, and that a review of this input will be included on <br /> the June meeting agenda for discussion. The Superintendent Negotiations Subcommittee,which includes <br /> 4 <br />