|
Lexington Home Page
|
Help
|
About
|
Browse
Search
FINAL OS Minutes 2018-10-16.pdf
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Minuteman Regional Vocational Technical School Committee (fka Minuteman Career & Technology High School & other names)
>
Minutes
>
2010-2019
>
2018
>
FINAL OS Minutes 2018-10-16.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 4:02:33 PM
Creation date
9/27/2022 3:15:06 PM
Metadata
Fields
Template:
Archives
Year
2018
Department
Schools
Keywords or Subject
Minutes - Minuteman Regional High School District Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACTION 2018#74 <br /> Moved(Leone)and seconded(Nourse) <br /> To authorize the Superintendent's Leadership Goals and Educator Annual Plan for 2018-2019, as presented <br /> VOTE: 8 members in room at time of vote <br /> Weighted Vote present: 69.99% <br /> Weight needed: >34.99% <br /> Names of towns opposing or abstaining: none <br /> Final percentage results of vote: 69.99% <br /> Final status of the vote: Unanimous <br /> 6. SCHOOL BUILDING COMMITTEE REPORT,Ford Spalding <br /> Mr. Spalding presented the School Building Committee update and reported that the project continues to be <br /> on budget, on time, with 44.3% of the funds expended, and updated the progress of the building site and <br /> highlighted the following: <br /> • Installation of Curtin Wall and glazing of Area A and B <br /> • Window Frames,metal panel framing and insulation—Area A and B <br /> • Installation of metal panel—Area A and B <br /> • Installation of in-wall blocking—Area A and B <br /> • Upper level window frames and masonry veneer—Area G <br /> • Installation of curtain wall frames—Area E <br /> • Exterior framing and sheathing—Area E <br /> • Installation of bituminous roofing assembly—Area E <br /> • Rough in of overhead MEP's in mechanical room—Area D <br /> • Masonry veneer work—Area D <br /> • Slab on grade placement for cafeteria and kitchen—Area E and F <br /> • Underground utilities for culinary kitchen—Area F <br /> • CMU wall construction—Area C <br /> • Exterior CMU walls—Area C <br /> Mr. Spalding also described the major project milestones that will take us to the end of the project as <br /> follows: <br /> • Place asphalt binder at look road around building in November 2018; <br /> • Building weather tight in December 2018; <br /> • Permanent power for the building in January 2019; <br /> • Begin Start-up & Testing of Major Equipment in February 2019; <br /> • Certificate of Occupancy for July 25, 2019; <br /> • Open School for Students on September 1, 2019; and <br /> • Project Substantial Completion Date of September 25, 2019 <br /> Discussion ensued. <br /> Mr. Spalding shared that the building is incredible. There are roughly 170 workers on site, which includes <br /> 50 masonry workers,and they continue to work to close up the building for the colder weather. <br /> Mr. Spalding then showed the latest film by Andrew Mudge. <br /> Discussion ensued relative to permits for staff and students for visits to the site. <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.