|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2005-06-01-DAC-MIN
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Design Advisory Committee-DAC
>
Minutes
>
2005-2009
>
2005
>
2005-06-01-DAC-MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2009 10:55:23 AM
Creation date
3/27/2009 10:55:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAC Meeting Minutes – June 1, 2005 <br />Page 2 of 2 <br />2.Waltham Street, Assessor’s Map 5, Parcel 11A (Special Permit with Site Plan <br />Review): <br /> Site development plans (dated 4/25/2005) and preliminary architectural plans <br />(dated 4/15/2005) for proposed office building with ground-floor retail banking facility <br />were reviewed. <br /> In general, the DAC has no objections to the proposal. <br /> The DAC would like to review and comment on additional information on <br />exterior lighting, exterior building materials and colors, and the free-standing sign in the <br />front yard, because submitted information was not sufficient. The applicant is urged to <br />design exterior lighting in conformance with Lexington lighting standards, and the <br />exterior sign in conformance with DAC guidelines described in “A Guide for Sign Permit <br />Applicants” available though the Town website. <br />3.Pedestrian Way between Bank of America and Carlson Real Estate: <br /> Carl presented a proposed plan for closing the existing driveway to vehicular <br />traffic and creating a brick-paved and landscaped pedestrian way, with a brick sidewalk <br />extending along the building housing Carlson Real Estate and leading to the Merriam <br />Street Parking lot. Requested by the Lexington Center Committee, this is part of a larger <br />plan for “Connectivity” and other improvements to the parking lots, the Depot, the bike <br />path, and other areas. A conceptual “master plan” is being developed for presentation at <br />the upcoming “charrette” of the Lexington Center Collaborative on June 11. <br />4.Lexington Center Collaborative: <br /> Carl gave a brief update on preparations for the “charrette” on June 11. <br />Adjournment: <br />The meeting was adjourned at approximately 10:00 PM. <br />Next meeting: <br />The next meeting will be Wednesday, July 6, 2005, at 7:30 PM in Room 111. <br />
The URL can be used to link to this page
Your browser does not support the video tag.