|
Lexington Home Page
|
Help
|
About
|
Browse
Search
1982-01-11-AC-MIN.pdf
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Appropriation Committee-AC
>
Minutes
>
1980-1989
>
1982
>
1982-01-11-AC-MIN.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2022 6:11:40 PM
Creation date
3/8/2022 6:10:58 PM
Metadata
Fields
Template:
Archives
Year
1982
Keywords or Subject
Minutes - AC - Appropriation Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPITAL IMPROVEMENT BUDGET 1983 - 87 <br /> Recreation Department <br /> Pool -- Monies for the pool were appropriated in 1979 and were <br /> bonded for a five year period. The pool will be paid <br /> for 1984. <br /> Tennis Courts ® this 1985 request is for the construction of <br /> four tennis courts at Diamond Jr_. High School. <br /> Development and Refurbishment of Recreation Parks and Playgrounds- <br /> The 1983 request of $5000 is for replacement of a back stop <br /> on Center #5 , the junior varsity hardball field located <br /> inside the football field. The $10 ,000 request to start in <br /> 1985 and continue every other year , is for the ongoing <br /> improvement of fields including Adams , Bridge , Fiske , <br /> Estabrook , to suggest a few. <br /> Recreation Study Update * The present study is somewhat outdated. <br /> In order to continue to project Capital improvements and <br /> set goals for the dept. , an update on the existing study <br /> is needed. <br /> Reservoir Sdrapn4 Project - Although the water quality and level <br /> of the Res should be improved by the deep well , this new <br /> water source will not eliminate the clarity and algae <br /> problem that gets worse each year. Periodic flushing of <br /> the Res is needed to maintain aesthetic appeal as a <br /> "viable swimming facility. <br /> All Weather Track - Request is for construction of an all-weather <br /> track to replace the existing outdoor track at the High School. <br /> Athletic Lighting - Request is for monies to construct perimeter <br /> lighting at Center 1 & 2 hard and softball fields on <br /> Worthen Rd. <br /> Lincoln Street/Worthen Rd Play Area Improvement - Request is in 3 <br /> parts. Initial monies are for a study of the area including <br /> soil tests and feasibility for development of Lincoln St. <br /> y and improvement of the Girls Soccer field on Worthen Rd. <br /> $ 10,000 is requested in 1984 for plans and specifications <br /> and $500, 000 in 1985 for actual development and improvement <br /> of the two sites. These fields are needed to meet the ever <br /> .increasing demands of residents. Although the school <br /> population appears to be decreasing, the request for fields <br /> has not. <br /> Center Basketball Courts Improvements - This request is for <br /> anticipated needed reconstruction of Center basketball <br /> courts as well as new lighting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.