Laserfiche WebLink
APPROPRIATION COMMITTEE <br /> REPORT TO OCTOBER 20 SPECIAL TowN MEETING <br /> RECOMMENDATIONS SUMMARY <br /> ARTICLE 2: REMODELINGIRECONSIRUCTION OF TOWN SCHOOLS <br /> By unanimous vote, the Appropriation Committee recommends that Town Meeting: <br /> • Appropriate 70.9 million to carry out Phase 1 of the School Building Project as voted by the School Committee <br /> on October 7, 1997. <br /> • Authorize borrowing to finance the $70.9 million Phase 1 project cost. <br /> Please refer to the detailed report beginning on page 4. <br /> ARTICLE 3: LIBRARY CONSTRUCTION <br /> By unanimous vote, the Appropriation Committee recommends that Town Meeting: <br /> • Appropriate an additional$1,050,000 to construct, reconstruct, repair, and equip Cary Memorial Library. <br /> This additional appropriation will allow the Library to add 5,000 sq. ft of badly needed future expansion space and to <br /> renovate Cary Hall for use as an interim library during construction. When added to the$7,850,000 1996 Town Meeting <br /> appropriation, the two appropriations will cover the$8.9 million total project cost. The Town's$2.4 million share of <br /> project costs will not increase; the Library Trustees have voted to increase their support. Outside sources will fund over <br /> 70% of the Library Project. <br /> Town Borrowing $2.4 million <br /> State Grant 2.8 million <br /> Trustees' Funds 3.7 million <br /> Library Project Total $8.9 million <br /> Annropriation Committee Report Page"of 13 October 13. 1997 <br />