|
Lexington Home Page
|
Help
|
About
|
Browse
Search
1997-10-20-AC-REPORT.pdf
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Appropriation Committee-AC
>
Minutes
>
1990-1999
>
1997
>
1997-10-20-AC-REPORT.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2022 3:47:21 PM
Creation date
3/8/2022 1:11:10 PM
Metadata
Fields
Template:
Archives
Year
1997
Keywords or Subject
Minutes - AC - Appropriation Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPROPRIATION COMMITTEE <br /> REPORT TO OCTOBER 20 SPECIAL TowN MEETING <br /> RECOMMENDATIONS SUMMARY <br /> ARTICLE 2: REMODELINGIRECONSIRUCTION OF TOWN SCHOOLS <br /> By unanimous vote, the Appropriation Committee recommends that Town Meeting: <br /> • Appropriate 70.9 million to carry out Phase 1 of the School Building Project as voted by the School Committee <br /> on October 7, 1997. <br /> • Authorize borrowing to finance the $70.9 million Phase 1 project cost. <br /> Please refer to the detailed report beginning on page 4. <br /> ARTICLE 3: LIBRARY CONSTRUCTION <br /> By unanimous vote, the Appropriation Committee recommends that Town Meeting: <br /> • Appropriate an additional$1,050,000 to construct, reconstruct, repair, and equip Cary Memorial Library. <br /> This additional appropriation will allow the Library to add 5,000 sq. ft of badly needed future expansion space and to <br /> renovate Cary Hall for use as an interim library during construction. When added to the$7,850,000 1996 Town Meeting <br /> appropriation, the two appropriations will cover the$8.9 million total project cost. The Town's$2.4 million share of <br /> project costs will not increase; the Library Trustees have voted to increase their support. Outside sources will fund over <br /> 70% of the Library Project. <br /> Town Borrowing $2.4 million <br /> State Grant 2.8 million <br /> Trustees' Funds 3.7 million <br /> Library Project Total $8.9 million <br /> Annropriation Committee Report Page"of 13 October 13. 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.