Laserfiche WebLink
Project: construction of 3 additions, landscaping, invasive plant removal, and wetland replication <br /> within 100-foot buffer zone to Isolated Vegetated Wetlands <br /> Documentation Submitted.- <br /> - <br /> ubmitted:— Stormwater Report; Prepared for: Lexington Housing Authority; Prepared by: Samiotes <br /> Consultants, Inc.; Stamped and signed by: Stephen R. Garvin, PE Civil No. 42772; Date: <br /> 11/30/2021; <br /> — Site plans; Sheet EX-1 "Existing Conditions Plan", Sheet EX-2 "Existing Conditions <br /> Plan", Sheet C-1.1 "Demo & Soil Erosion Plan", Sheet C-2.1 "Drainage Plan", Sheet C- <br /> 3.1 "Civil Details", Sheet L1.1 "Landscape Layout& Materials Plan", Sheet L1.2 <br /> "Landscape Planting Plan", Sheet L1.3 "Landscape Site Planting Plan", Sheet L2.1 "Site <br /> Details and Sections", "Proposed Wetland Replication Plan"; <br /> — Notice of Intent application and attachments; Prepared by: Samiotes Consultants, Inc.; <br /> Date: 11/30/2021; <br /> — Engineering Comments; From: Marissa Liggiero, Engineering; Subject: 10 Vynebrooke <br /> Village NOI Engineering Comments; Date: 12/15/2021; <br /> Ms. Michelle Kayserman, Samiotes Consultants,presented before the Commission. <br /> Ms. Ladd stated that the asphalt apron off the turnaround and next to the community building is <br /> huge. Ms. Ladd asked if some of that impervious surface could be removed. Ms. Annie Steele, <br /> project architect, responded that the size may be necessary for emergency vehicles to access; <br /> however, she will take a look at this for the next meeting. Ms. Ladd followed up stating that an <br /> action like reducing pavement in this area could go a long way towards providing additional <br /> mitigation. <br /> It was asked if a cross section of the proposed mitigation site was provided. Ms. Kayserman <br /> responded that she doesn't believe this information was provided but will submit it as part of the <br /> supplemental information for the next meeting. <br /> It was noted that no runoff attenuation is being provided for the new walkway in the front of the <br /> building and this will need to be included within the stormwater management report. The <br /> applicant does not need to manage that specific stormwater; however, they could increase the <br /> size of the rain garden to capture additional roof runoff from another part of the building. <br /> On a motion by Ms. Dohan and seconded by Mr. Hamilton, the Commission voted 7-0 by roll <br /> call vote to continue the hearing to the January 24, 2022 meeting at the applicant's request. <br /> Record of vote as follows: <br /> Duke Bitsko—Aye <br /> Kevin Beuttell —Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br />