Laserfiche WebLink
— Wetland Border Report; Prepared by: Mitch Maslanka, Goddard Consulting LLC; <br /> Prepared for: Inna Rifman; Date: 4/2/2021; <br /> — Cover Letter; Prepared by: Mitch Maslanka, Goddard Consulting LLC; Date: <br /> 11/17/2021; <br /> — Stormwater Analysis; Prepared, stamped and signed by: Frederick W. Russell, <br /> PE; Date: 11/12/2021; <br /> Mr. Mitch Maslanka, Goddard Consulting LLC,presented to the Commission. Mr. Maslanka <br /> stated that the proposed construction will take place within the 50-100 foot buffer zone and the <br /> infiltration area is being installed in the front yard with a trench drain located at the end of the <br /> driveway. He added that a small Swale is being proposed on the side (east) yard to prevent <br /> stormwater runoff onto the abutting property, and that all roof runoff will be captured in the <br /> infiltration system. <br /> It was requested that the tree stump remain in place, if possible and Mr. Maslanka responded that <br /> he will discuss with the property owner and provide a response at the next meeting. <br /> Mr. Robert Hannigan, owner of 6 Ames Avenue, spoke on behalf of abutters in the <br /> neighborhood. Mr. Hannigan stated that some abutters constantly have water in their basement <br /> and there is a lot of concern for those who are pumping water regularly out of their basements. <br /> Mr. Maslanka explained how the cultec chamber system will function, and that runoff will be <br /> infiltrated multiple feet below ground and on this lot. Mr. Maslanka added that the applicant has <br /> put forth his best effort to mitigate as much stormwater runoff as possible. Ms. Dohan responded <br /> that the existing dwelling has no infiltration and the proposed dwelling with stormwater <br /> management will allow less runoff from the property to surrounding properties. <br /> On a motion by Mr. Langseth and seconded by Ms. Ladd, the Commission voted 6-0 by roll call <br /> vote to continue the hearing to the December 20, 2021 meeting at the applicant's request. <br /> Record of vote as follows: <br /> Kevin Beuttell —Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> 8:23 PM <br /> New Business/Pendine Matters, Continued <br /> Enforcement Order: 7 Tufts Road, VPC#EO-21-2; tree removal within wetlands and 100-foot <br /> buffer zone <br /> Ms. Mullins stated that there is no update and awaiting response from the property owner. <br />