Laserfiche WebLink
3. Liaison Reports <br /> 3.1. DPW - Ross Morrow <br /> • Centerscape <br /> • Utility poles-Mass Ave and Worthen <br /> • Discussion Followed: <br /> o Jim-Any Improvements? Ross-Hartwell is a long way out. <br /> What is happening sooner is-Striping-waltham St, South of <br /> Rte2 in 2022 + Adding bike lanes at waltham town lane. <br /> Still in Design phase <br /> o Simon - Suggested having a Water station at arlington- <br /> side. One near DPW is good. One near Arlington-side near <br /> Trader Joe's/Bow Street. Ram will raise with FOLB. Simon <br /> said he could organize donations. Betty-Depot Water <br /> Station was funded by FOLB. Ram to talk to Peggy. <br /> o Betty-Waltham St bike lane- Is it std bike lane or does <br /> it have buffers like what DOT did. Ross will share plans, <br /> when available. Ross-Bike paths will be on both sides, <br /> most probably. <br /> 3.2. Police - Alex Hagenah <br /> • Not able to make it <br /> 3.3. Planning - Robert Peters <br /> • Some links sent out - for Rte2A bridge. Hearing earlier today. <br /> No one from LBAC was able to attend. <br /> �!! s:f/www.in� Ov/ v n 011 x1in On.. irO 0 Il 2 liIn, l�airli .. <br /> .............................................................................................................................................................................................................................. .............. ............................................................................................................................ .............. <br /> r IIa irni nt....mUt ��....0v ir....li.... 5....2021....1t�....14t1 t�f�f�t�....t�4t�f�....2021....1t�.... <br /> 1 41299999....9499 <br /> ............................................................................................................... <br /> • Bedford and Hartwell - Complete Streets presentation on Oct 19. <br /> Consultants to present. Looking for people to chime in. Ross- <br /> This includes- Bedford St, Hartwell Ave, Eldred, Wood, Maguire <br /> and Westview, as well. LBAC should attend. Survey results will <br /> be presented. Full Design/25% Design-2 years from now. Should <br /> talk about Separated bike lanes. Also, there is a website and <br /> add comments. Matthias may attend, someone suggested (as it <br /> affects Lincoln Labs) <br /> • Rte 2A resurfacing - West of Rte 128 to Lincoln/Concord. <br /> Richard Canale (BattleRoad project) had said more than repaving <br /> should be done. But for now, only, couple of medians. Maybe <br /> after 2025 changes can happen. <br /> 3.4. TSG - Ram (Ross and Susan also attended the last meeting) <br />