2021-1 STM APPROPRIATION COMMITTEE I NOVEMBER 2021 <br /> to initiate a community conversation on policing and the needs of the proposed Police Station. With that <br /> process now completed,the Select Board is ready to proceed with the project, incorporating recommenda- <br /> tions resulting from the outreach into the design of the new station. <br /> At the Select Board's request, the architect provided two new design alternatives. Option A incorporated <br /> limited changes to the existing design without enlarging the building. Option B included more extensive <br /> modifications from the existing design, including a larger building, in response to suggestions from the <br /> community conversations. The Select Board recently voted to support Option B, with an estimated con- <br /> struction cost of$32.8 million,which is approximately 10 percent more than the cost for Option A. <br /> A supplemental appropriation of$254,315 is now sought to cover additional architectural fees due to: <br /> 1. The Select Board's request for two new Schematic Design alternatives <br /> 2. A decision to integrate solar panels into the design <br /> 3. The need for post-construction restoration of Fletcher Park <br /> 4. Additional design changes based on community feedback. <br /> The remaining $614,100 of the appropriation would fund the construction costs to convert 173 Bedford <br /> Street from its prior use as a temporary Fire Station to a temporary Police Station.All changes would be to <br /> the building's interior, including securing the main entrance and adding a secure booking and interview <br /> space, an evidence evaluation lab and storage facility, a dispatch center, and a communications equipment <br /> area. <br /> A detailed breakdown of all funds requested follows: <br /> Police Station—Design and Construction Documents <br /> Additional architect fees $254,315 <br /> Swing Space Renovation– 173 Bedford St <br /> Construction/Renovation $375,000 <br /> Antennas/Radio communication equipment $123,000 <br /> Relocate the 911 Dispatch Center $50,000 <br /> Architect fees $41,100 <br /> Relocation costs $25,000 <br /> Total $868,415 <br /> The requested amount is rounded up to $870,000. It is anticipated that a request for the appropriation of <br /> construction funds for the new Police Station will be made at the 2022 Annual Town Meeting,presumably <br /> contingent on a debt exclusion referendum to be held later in the spring. If the funding is approved, con- <br /> struction of the new Police Station could begin as early as the fall of 2022. <br /> The Committee recommends approval by a vote of(8-0). <br /> Article 6 <br /> Appropriate for Community Preservation Projects <br /> Funds Requested Funding Source Committee Recommendation <br /> $75,000 <br /> $235,750 CPA Approve(8-0) <br /> $310,750 <br /> At the 2021 Annual Town Meeting a total of$2,684,550 was appropriated under the Community Preserva- <br /> tion Act(CPA),primarily for debt service on previously approved land acquisitions and the renovation of <br /> 7 <br />