|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2021-11-08-CPC-STM-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Town Meeting Minutes and Reports
>
2020-2029
>
2021
>
Reports
>
2021-11-08-CPC-STM-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 4:25:45 PM
Creation date
10/29/2021 11:31:55 AM
Metadata
Fields
Template:
Archives
Year
2021
Author or Source
Community Preservation Committee
Department
Town Clerk
Keywords or Subject
Report - CPC - Community Preservation Committee Community Preservation Committee Report to Special Town Meeting 2021-1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 6 (a) <br /> Project: Park and Playground Improvements- Sutherland <br /> Park Supplemental <br /> CPA Category: Recreational Resources <br /> Amount Requested: $ 75,000 <br /> Amount Recommended: $ 75,000 <br /> CPC Vote: 8-0-1 <br /> Project Description: <br /> This FY22 supplemental request will fund the installation of additional play equipment for <br /> children five to twelve years old at Sutherland Park. The 2020 Annual Town Meeting <br /> appropriated $95,000 under Article 10(i) for the update and replacement of playground <br /> equipment and installation of a bike rack at Sutherland Park. This request will bring the total <br /> Sutherland Park Improvements project cost to $170,000. <br /> At the recommendation of the ADA Compliance Study that was completed in 2017, the 2020 <br /> Town Meeting-approved project included the installation of poured-in-place safety surfacing <br /> leading to a new play structure and accessible swing, an accessible route to the dugouts at the <br /> baseball field was created and an accessible path has been extended from the existing asphalt <br /> path to the water fountain near the entrance of the park. This new playground installation was <br /> designed for children two to five years old. The supplemental request will provide accessible <br /> play equipment for children five to twelve years in addition to the equipment currently on the <br /> site. Sutherland Park is a 20 acre property located at the end of Sutherland Road and has a space <br /> to accommodate additional play equipment without impacting the existing amenities. <br /> Project Goals and Objectives: <br /> • Provide accessible play equipment for children five to twelve years old in addition to the <br /> equipment currently on the site designed for children two to five years old; <br /> • Expand access to more outdoor recreation opportunities to encourage social, emotional <br /> and gross motor skills for school aged children; and <br /> • Provide access to a year-round play structure that is currently not available in this <br /> neighborhood for five to twelve year olds. <br /> Project Benefit: <br /> An additional structure would result in accessible play equipment for all children ages two to <br /> twelve. Supplemental funding would allow the life of the two pieces of equipment to be in line, <br /> avoiding multiple years of construction for replacement purposes. <br /> Funding Request: <br /> The FY22 request is $75,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.