|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2016-02-08-CEC-STM1-STM2-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Capital Expenditures Committee-CEC
>
Minutes
>
2010-2019
>
2016
>
2016-02-08-CEC-STM1-STM2-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2019 8:55:43 AM
Creation date
2/2/2016 3:30:01 PM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
Minutes - CEC - Captial Expenditures Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPITAL EXPENDITURES COMMITTEE REPORT TO FEBRUARY 8, 2016, STMs 2016 -1 & 2016 -2 <br />For that reason, this Committee is reporting on this matter, as we did to the 2014 Annual Town Meeting, <br />despite the fact that all funding for the Minuteman district — including an apportionment of any capital <br />costs —would come through the assessment process and be an expense of the Operating Budget. <br />The current Minuteman facility is inadequate and in failing condition. This Committee joins in support <br />for a new facility and once again, this Committee unanimously recommends approval of the Amended <br />Agreement being presented. <br />STM 2016 -1, Article 3: <br />APPROPRIATE FOR <br />HASTINGS SCHOOL <br />FEASIBILITY STUDY <br />Fund <br />Authorization <br />Requested <br />Funding <br />Source <br />Committee Recommends <br />$1,500,000 <br />GF (Candidate for <br />Excluded Debt) <br />Approval (5 -0) <br />"To see if the Town will vote to appropriate, borrow or transfer from available funds, an amount of <br />money, to be expended under the direction of the Permanent Building Committee, for the costs of a <br />feasibility study relating to the Hastings School located at 7 Crosby Road, in Lexington, for which <br />feasibility study the Town may be eligible for a grant from the Massachusetts School Building <br />Authority ( "MSBA "). The MSBA's grant program is a non - entitlement, discretionary program based <br />on need, as determined by the MSBA, and any costs the Town incurs in connection with the feasibility <br />study in excess of any grant approved by and received from the MSBA shall be the sole responsibility <br />of the Town, or act in any other manner in relation thereto." <br />"DESCRIPTION: On January 27, 2016, the Board of the Massachusetts School Building Authority is <br />expected to vote on Lexington's application to accept the Hastings School into the MSBA <br />reimbursement program. If the Town's application is approved at that time, this Article would fund the <br />first phase of the process, conducting a feasibility study." <br />[Town Warrant for 2016 -1] <br />The Massachusetts School Building Authority (MSBA) Board of Directors did authorize an invitation to <br />Lexington to proceed into the Eligibility Period —the 1st module (which must be completed within <br />270 days of that Board's authorization) in the MSBA's 8- module Building Process: <br />MS <br />A Building Process <br />i!y.for: <br />%ttrll»>I»llli»>II»l giii 11 % <br />1°11"1 iii io <br />>l>l>l>1I11�111D11111ID1�O iiiiii1I11D111111111111111 IU <br />j�JJllllJl����l��ll ��11�11�� <br />h. +l•uildin>s. ore/ it in / <br />11J11JJ111 /I / / /1 /JJl / / /// /ii/ 0 <br />One of the requirements of the Eligibility Period is a local vote to authorize funding for the <br />MSBA - specified Feasibility Study (FS). This Article provides for that vote and includes the information <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.