|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2020-11-12-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2020
>
2020-11-12-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2021 11:35:48 AM
Creation date
9/2/2021 11:35:47 AM
Metadata
Fields
Template:
Archives
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Town of Lexington Permanent Building Committee op�J51775"N�c <br /> � A <br /> Q y 3 <br /> Permanent Members: Co-Chairman:Jon Himmel &Co-Chairman Dick Perry, Philip Coleman, <br /> 3 a <br /> Charles Favazzo, Carl Oldenburg, Peter Johnson, Celis Brisbin fk;� toy <br /> Project Specific Members: <br /> Fire Station: Robert Cunha &Joseph Sirkovich <br /> Hastings Elementary: Curt Barrentine &Andrew Clarke <br /> Visitors Center:Joel Berman & Peter Kelly <br /> PBC Minutes 11-12-20 Held Via Zoom 6PM <br /> Members present:Jon Himmel, Dick Perry. Carl Oldenberg. Peter Johnson, Chuck Favazzo, Phil Coleman, Celis <br /> Brizben <br /> Members of DAC and Liaisons from Other Committees noted were: Mark Sandeen, Suzie Barry, Steve Vincent, <br /> Chris Jonas, Brigitte Steins <br /> Staff members present: Mike Cronin, Dave Pinsonnault, Mark Barrett <br /> TBA Architects:Justin Humphries,A.Jamison <br /> Approval of Meeting Minutes <br /> Three sets of Meeting minutes were discussed; 1/9/20; 2/4/20; and 6/8/20. It was noted that comments <br /> received were incorporated and the minutes updated. With no other comments received a motion was made to <br /> approve the minute of 1/9/20, 2/4/20 and 6/8/20 as corrected. Motion was seconded and approved. <br /> Westview Cemetery Building project update. <br /> Justin Humphreys from TBA architects was present to provide an update on the status of the project. <br /> The current building design is approx. 4,100 sf of which approx. half of that square footage is garage space. The <br /> project is based upon the findings of a 2016 study that showed that the existing facility does not support the <br /> needs of the community, staff and daily operations that need to take place there. <br /> The overall cemetery site was shown to be only half developed and contain the existing building. A portion of <br /> the undeveloped section of the project, next to the existing animal control building and facing Westview Street, <br /> will be cleared to support the new building. Once complete and occupied the existing building can be removed <br /> and that area returned to cemetery use. <br /> The floor plans were reviewed. There were two aspects of the layout or design of the floor plan that were <br /> discussed. The first is that the building has three distinct areas or zones of use. Public/Visitor, <br /> Staff/Administrative and Back of house/field operations. The plan layout demonstrates these zones and helps <br /> define those spaces. The second Characteristic is the design of the feature wall the cuts thru the building and <br /> effectively sections the building into Front of house and back of house. This feature wall provides a visual <br /> element through the public space and continues through the administrative space. <br /> A prior comment on the floor plan was to maximize the use of daylight.TBA advised that plan adjustments had <br /> been made from that input. <br /> The building elevations were reviewed and it was discussed that the design elevations as presented were not yet <br /> fully updated to reflect the most current plan details such as fenestrations. <br /> The architect explained that given the start and stop history of the project various elements of the work are at <br /> different levels of completion as the project has had numerous points of adjustment. <br /> The Project Schedule slide was presented and showed a goal of 90%Construction Documents by December 2020, <br /> bidding by late January 2021, Construction start by March 2021 and completion by December 2021 with the <br /> Public works Cemetery staff moving in by the start of 2022. <br /> 201 BEDFORD STREET• LEXINGTON, MASSACHUSETTS 02420 <br />
The URL can be used to link to this page
Your browser does not support the video tag.