Laserfiche WebLink
— Performed soil testing at the east end of the parking area to see if groundwater recharge <br /> would be possible, but found poor fill material and high groundwater. Unable to <br /> incorporate stormwater recharge given the topographic and soil conditions. <br /> — Proposing to connect the existing catch basin after the stormwater treatment unit. <br /> — Proposing to replace the loam and seed mix with a like-kind mix. <br /> — The size of the rip rap is based on stormwater regulations and the calculations are in the <br /> report. <br /> — The tree line is at the wetland line and will be maintained as existing lawn on the slope <br /> where the outlet is being proposed. <br /> On a motion by Ms. Beuttell and seconded by Ms. Ladd, the Commission voted 5-0 by roll call <br /> vote to close the hearing. <br /> Record of vote as follows: <br /> Duke Bitsko —Aye <br /> Kevin Beuttell—Aye <br /> Ruth Ladd—Aye <br /> Holly Samuels —Aye <br /> David Langseth—Aye <br /> 1:28:13 (LexMedia recording) <br /> Continued Public Meetings/Hearings <br /> Notice of Intent—8 Paddock Lane <br /> ViewPoint Cloud Permit# CN0I-21-29, DEP#201-1230 <br /> Applicant/Property Owner: Sabrina and Raffi Afeyan <br /> Project: proposed front and rear additions, and the addition of a patio, deck, walkway and stairs <br /> to a single-family dwelling located within the 100-foot buffer zone to Bordering Vegetated <br /> Wetlands <br /> Previous Meeting Date: 7/6/2021 <br /> Supplemental Documentation: <br /> — Revised Plans; "Existing Conditions", "Site Plan and Demolition", "Grading, Drainage <br /> and Erosion Control Plan", and "Details"; Prepared by: Allen & Major Associates, Inc.; <br /> Stamped and signed by: Carlton M. Quinn, PE Civil No. 49923; Date: 6/15/2021; <br /> Revised: 7/26/2021; <br /> — "Drainage Report"; Prepared by: Allen & Major Associates, Inc.; Prepared for: Sabrina <br /> List Afeyan, Property Owner; Date: 6/15/2021; Revised: 7/26/2021; <br /> — Letter from Engineer; From: Allen & Major Associates, Inc.; Signed by: Steven Lee, PE; <br /> To: Lexington Conservation Commission; RE: A&M Project#2931-01; Date: 7/26/2021; <br /> — Form 11: Soil Suitability Assessment for In-Site Sewage Disposal; Locus: 8 Paddock <br /> Lane, Lexington, MA; Pages 1 through 8 of 8; Date signed by Steven Lee, Soil <br /> Evaluator: 7/26/2021; <br /> — Engineering Review; From: Michael Sprague, Engineering; To: Karen Mullins, <br /> Conservation; RE: 8 Paddock Lane NOI Comments 2; Date: 7/29/2021; <br />