Laserfiche WebLink
ViewPoint Cloud Permit#AOOC-21-7, DEP#201-1126, BL# 1083 <br /> Applicant/Property Owner: Lauren Dillon <br /> Project: request to modify the design details and specifications of a previously approved <br /> subsurface infiltration chamber within the 100-foot buffer zone to Bordering Vegetated <br /> Wetlands. <br /> *Vote to issue the Amended Order of Conditions if the hearing is closed. <br /> Documentation Submitted.- <br /> - <br /> ubmitted:— Letter from Engineer and hydrograph attachments; From: Molly Obendorf, PE, Stamski <br /> and McNary, Inc.; To: Lexington Conservation Commission; Date: 7/l/2021; <br /> — "Interim As-Built Amended Order of Conditions Plan"; Prepared by: Stamski and <br /> McNary, Inc.; Stamped and signed by: George Dimakarakos, PE Civil No. 41281; Dated <br /> 11/30/2020 and revised through 6/14/2021; <br /> — Engineering Review; Memorandum; From: Michael Sprague, Engineering; To: Karen <br /> Mullins, Conservation; RE: 6 Blinn Rd AOOC 2; Date: 7/27/2021; <br /> Ms. Lauren Dillon, property owner, presented the request to modify the design details of the <br /> subsurface infiltration system. The request received a favorable engineering review. <br /> On a motion by Ms. Samuels and seconded by Mr. Beuttell, the Commission voted 5-0 by roll <br /> call vote to close the hearing. <br /> Record of vote as follows: <br /> Duke Bitsko —Aye <br /> Kevin Beuttell—Aye <br /> Ruth Ladd—Aye <br /> Holly Samuels —Aye <br /> David Langseth—Aye <br /> On a motion by Mr. Beuttell and seconded by Mr. Bitsko, the Commission voted 5-0 by roll call <br /> vote to issue the Amendment to the Order of Conditions. <br /> Record of vote as follows: <br /> Duke Bitsko —Aye <br /> Kevin Beuttell—Aye <br /> Ruth Ladd—Aye <br /> Holly Samuels —Aye <br /> David Langseth—Aye <br /> Request for Partial Certificate of Compliance: 6 Blinn Road, ViewPoint Cloud#COC-21-13, <br /> DEP4201-1126, BL# 1083 (vote to issue if the Amended Order of Conditions is issued) <br /> On a motion by Ms. Samuels and seconded by Mr. Beuttell, the Commission voted 5-0 by roll to <br /> issue the Partial Certificate of Compliance with ongoing conditions related to the two-year <br />