Laserfiche WebLink
Project: Proposed construction of a garage and living space addition to a single-family dwelling <br /> and expansion of a driveway. The proposed activities are located within the outer portion of <br /> 'Previously Developed' Riverfront Area associated with an offsite, unnamed perennial stream. <br /> The Applicant proposes to implement erosion controls to minimize the potential for impacts to <br /> the resource areas during construction, and stormwater management to improve existing site <br /> conditions. <br /> Documentation Submitted: <br /> — "Drainage Plan" Sheet C-0; "Drainage Plan" Sheet C-1; Prepared by: Gala Simon <br /> Associates, Inc.; Stamped and signed by: Alberto M. Gala, PE Civil No. 36434; Date: <br /> 6/22/2021; Revised "Label, misc." 6/30/2021; <br /> — "Notice of Intent Applicant and Wetland Resource Area Analysis" and attachments; <br /> Prepared for Applicant/Property Owner: Amy Hung; Prepared by: LEC Environmental <br /> Consultants, Inc.; Date: 6/29/2021; <br /> — "Engineering Drainage Calculations for 12 Ledgelawn Avenue, Lexington, <br /> Massachusetts"; Prepared by: Gala Simon Associates, Inc.; Stamped and signed by: <br /> Alberto M. Gala, PE; Date: 6/22/2021; <br /> Ms. Julia Hoogeboom, LEC Environmental, and Mr. Al Gala, Project Engineer, presented before <br /> the Commission. Mr. Gala stated that soil tests pits were performed and groundwater was not <br /> observed. A DEP number has not yet been issued. <br /> Questions from the Commission: <br /> — Where is the construction entrance? <br /> — Why is the front half of the dwelling not included in the infiltration system? <br /> — Would like to see much more tree protection around the 34-inch maple on the <br /> southwestern portion of the front of the dwelling. It is very close to the access route and <br /> proposed regrading work, would prefer more root protection in place and something more <br /> semi-permanent like a chain link fence. <br /> Responses from the Representative: <br /> — The construction entrance is shown on the existing conditions plan, towards the end of <br /> the driveway. <br /> — The front half of the dwelling could be added into the drainage calculations, however, <br /> what is being proposed was sufficient to meet requirements. Could connect the <br /> downspout. <br /> — Would be open to a Condition that a certified arborist be on site to supervise the tree <br /> protection. <br /> On a motion by Mr. Beuttell and seconded by Ms. Dohan, the Commission voted 7-0 by roll call <br /> vote to continue the hearing to the August 2, 2021 meeting at the applicant's request. <br /> Record of vote as follows: <br /> Kevin Beuttell—Aye <br /> Duke Bitsko —Aye <br /> Alex Dohan—Aye <br />