Laserfiche WebLink
Selectmen Meeting – September 9, 2015 <br /> <br /> <br /> <br />Preliminary FY2016 water and wastewater rates; <br /> <br /> <br />A presentation of the combined impact of FY2016 water and wastewater rates at various <br />levels of annual usage; <br /> <br /> <br />A history of combined rate increases in Lexington and their impact on the cost for the <br />household of average usage; <br /> <br /> <br />Retained earnings history for the water and wastewater funds; and <br /> <br /> <br />MWRA Advisory Board Annual Water and Wastewater Retail Rate Survey, November <br />2014. <br /> <br />Mr. Kelley asked about indirect cost difference for water and wastewater. Mr. Addelson will get <br />the information and look at the detail. <br /> <br />Mr. Kanter, Precinct 7 Town Meeting Member, would have preferred the Tier 1 increase be <br />shown as less than Tiers 2 and 3, but is delighted to see that the high percentage of users are in <br />Tier 1. He felt it would be a better signal if indicated doing best to keep the low consumers rate <br />increases smaller than the high users. <br /> <br />Mr. Addelson will return to the Selectmen’s meeting on September 21, 2015, to receive public <br />comments on the preliminary water and sewer rates for FY2016. On October 5 the Selectmen <br />will vote on the recommended FY2016 water and sewer rates. <br /> <br />Continued Grant of Location – Verizon/Eversource – Philip Road <br /> <br />This hearing was continued from the August 31, 2015 Selectmen meeting when an abutter, Mr. <br />Shapiro, 17 Lantern Lane, requested that an alternative location be looked at for the new pole. <br />Engineering staff met on Philip Road with Mr. Shapiro, representatives from Verizon/Eversource <br />and the developer that requested the service. <br /> <br />Ms. Correia, representing Verizon/Eversource, requested approval for a revised plan to locate the <br />new pole between 8 and 10 Philip Road in the right of way. <br /> <br />Mr. Shapiro thanked the Selectmen and staff for taking the time to address his concerns. <br /> <br />Upon motion duly made and seconded, it was voted 5-0 to approve the petition of Verizon New <br />England, Inc. and Eversource Energy to locate poles, wires, cables and fixtures, including the <br />necessary anchors, guys and other such sustaining and protecting fixtures to be owned and used <br />in common by your petitions, along and across Philip Road to install one (1) JO pole, P.325-4, <br />on the southeasterly side of Philip Road at a point approximately 124 feet southwesterly from <br />existing Pole P.325-4, being located on the southeasterly side of Philip Road. <br /> <br />Mr. Pato closed the hearing at 9:37 a.m. <br /> <br /> <br /> <br />