|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2015-10-10-LBAC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Lexington Bicycle Advisory Committee-LBAC
>
Minutes
>
2010-2019
>
2015
>
2015-10-10-LBAC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 4:19:50 PM
Creation date
1/11/2016 10:58:05 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />APPROVED MEETING MINUTES <br />Committee Name: Lexington Bicycle Advisory Committee <br />Date, Time and Location of Meeting: October 10, 2015, 7 pm, Cary Library <br />Members Present <br />: Peggy Enders (Chair), Laurel Carpenter, John Frey, George Gagliardi, <br />Mike Tabaczynski, Marita Hartshorn, Sandra Shaw (Recreation Liaison) <br />Members Absent <br />: Bob Dangel, Carolyn Levi, Bob Hausslein <br />Others Present <br />: Jennifer Merlot <br />Review September Meeting Minutes <br />: The September minutes were approved as corrected. <br />Bicycle-Pedestrian Committee? <br />: Peggy met with David Kucharsky and Suzie Barry regarding <br />the possibility of combining the Sidewalk Committee with the Bicycle Advisory Committee to <br />form a Bike/Ped committee. Peggy briefed Suzie on the Committee’s mission, accomplishments <br />and relationship to other committees and the town and voiced the Committee’s position with <br />respect to the need for Town staff support if such a committee were to be formed. <br />Bikeway Paving, Closures, Detours (update): <br /> A number of detour options were provided to <br />Bikeway users while the Bedford Street to Bedford town line was being repaved. Jennifer <br />developed great messaging for users; Peggy had large signs printed and posted them at the <br />various detour points. As of now, the paving is complete, but there are berms along the newly <br />paved path that are quite steep; the edges need to be filled. <br />Arterial Bike Accommodations: <br /> Peggy reported on the September 25 meeting with John <br />Livsey, Jennifer Melot and others to review the status of bicycle accommodations on recently <br />paved town roadways and the Bikeway. The results of that meeting were summarized in a <br />document shared with the Committee and include a number of roadways that were repaved <br />several years ago. Peggy said that the DPW plans to request a budget for on-going bike <br />striping (sharrows, bike lanes, etc.) at the spring Town Meeting. Laurel Carpenter suggested <br />that such documents be made more public and transparent and that the process allow for more <br />input on priorities. <br />th <br />New England Bike/Walk Summit <br />: Laurel distributed the program for the Sept 24 event. She <br />attended Engineering and Design Done Right Parts 1 and 2 and Greater Connectivity for <br />Greater Utility. She noted that many people are working hard to improve bicycle/pedestrian <br />accommodations. <br />Master Plan for Bikeway Signage <br />: Peggy reported on the meeting held on September 24 <br />with the Toole Design Group to launch the “master plan” phase for Bikeway signage. Mike, <br />Jennifer, Richard Canale, Bob Hausslein and Bob Dangel attended with Peggy, John Livsey <br />and David Kucharsky. She said that Toole Design will consider the preliminary <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.