|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2015-09-10-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2015
>
2015-09-10-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:58:32 PM
Creation date
11/18/2015 9:01:42 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permanent Building Committee <br />Town of Lexington <br />201 Bedford Street, Room 221 <br />Lexington, MA 02420 <br />September 10, 2015, 6:00 p.m. <br />Present: Jon Himmel, Chairman, Eric Brown, Vice - Chairman, Dick Perry, Carl Oldenburg, <br />Charles Favazzo, Philip Coleman; and Bill Hurley <br />Absent: Peter Johnson, Lee Noel -Chase <br />Guests: Don Mills, Mills Whitaker Architects LLC; Dave Billings, Hill International; Ken DiNisco, <br />Angel Khazadian and Vivian Lowe, DiNisco Design Partnership; Judy Crocker, School <br />Committee Liaison; Jill Hai, Capital Expenditures Committee Liaison <br />Lexington DPF: Patrick Goddard, Director of Public Facilities and Mark Barrett, RA Project <br />Manager <br />The Minutes were taken by Jean Curran, Recording Secretary <br />Jon Himmel called the Meeting to order at 6:05 p.m. <br />1. General Business <br />• Jon Himmel suggested postponing approval of the August 13, 2015 meeting minutes <br />until next month. The members all agreed. <br />2. Visitors Center Update <br />• Don Mills shared that his company Mills Whitaker Architects LLC were selected to <br />perform the first round of work for the Visitor Center Project. The goal for tonight was to <br />review what work had been completed to date, and what the next steps were. <br />o Reviewed existing Building and current uses <br />o Prepared measured drawings of building <br />o Reviewed criteria of battle green master plan <br />o Met with 16 stakeholder groups to review program intent <br />o Reviewed summary program developed by Town <br />o Developed two basic concepts for discussion <br />• The stakeholders would like to keep the visitor center open during construction. <br />• The Preliminary Program consisted of (i) customer service counter for welcoming and <br />assisting multiple visitors simultaneously; (ii) orientation space to accommodate a typical <br />bus tour group of 55 and for use during inclement weather; (iii) accessible restrooms <br />with after -hours access from the outside; (iv) redesigned rear entry from bikeway to <br />attract guests; (v) contemplative area for honoring Veterans with visual connection to the <br />exterior memorials; (vi) self- service kiosk with materials in multiple languages; (vii) <br />exterior site work in coordination with the ongoing Battle Green Master Plan; and (viii) <br />consider cost of adding second floor public space with controlled after hour access. <br />PBC Meeting 091015 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.