Laserfiche WebLink
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2011 ATM <br /> Recreation <br /> The Recreation programs in the FY2012 budget have three funding sources: CPF for projects that meet <br /> the criterion for protection of a recreation resource, Recreation EF for fee-based program facilities, and <br /> tax levy for a non-fee-based community facilities such as neighborhood playgrounds. <br /> The second phase of the Drainage Implementation Plan for the Center Playfields complex seeks <br /> Community Preservation Funding under Article 8(g) this year and Phase III in FY2013 (estimated at <br /> $605,718) would complete the project. This large Drainage project will restore, progressively, most play <br /> fields in the 23-acre site to a much higher standard of use and playability. The last phase would address <br /> the Little League/Jr. Varsity Softball field, practice-field area, and the parking lot. Total project cost <br /> remains at$2.39 million, largely devoted to construction. <br /> In Article 9, funds are being requested from the Recreation EF for Phase II of renovations at the Irving H. <br /> Mabee Pool Complex as the swimming program is fee-based. Phase II addresses interior repairs and <br /> renovations to enhance environmental and energy efficiencies. The last phase of the pool project will <br /> replace the present filtration system and require additional building space to house a fourth filtration <br /> system(projected to cost$1,120,000 in FY2016). <br /> The third project, in Article 10(o), requests tax-levy funding for the renovations of the field behind the <br /> Franklin Housing complex. This continues a yearly renewal of neighborhood programs with out-year <br /> projects being as follows: The proposed renovation schedule is FY2013 Irrigation improvements at <br /> Garfield Park and additional irrigation at Diamond and Clarke Fields ($50,000); FY2014 Replace <br /> surface Field 1 at Lincoln Park and possibly Estabrook, which was deleted from this year's projects, for <br /> $200,000; FY2015 Field 2 at Lincoln Park and Fields at Southland ($200,000); [and] FY 2016 Center <br /> Track field area and #3 field at Lincoln Park. Additional tax-levy funded is slated for resurfacing the <br /> Center track FY2013 ($110,000); Ringe and Marvin basketball re-surfacing in FY2016. The remaining <br /> resurfacing project is for $75,000 in FY2015 for the Gallagher Tennis Courts and Clarke tennis courts <br /> will ask for Recreation Enterprise funds. <br /> Athletic field lighting will be addressed in two phases. In FY2013, energy-efficient lighting structures <br /> will replace present Gallagher tennis court lights from the Recreation EF ($172,927) and on Center <br /> Basketball Courts from tax levy ($96,542). In FY2015, Phase II lighting Plan is to replace the Center #2 <br /> Varsity Softball structure ($172,926) and Center #1 Varsity Baseball field structure ($286,433), both tax <br /> levy with a 25-year warranty and maintenance plan. <br /> Pine Meadows has a regular equipment-replacement program for the heavily used specialized mowers <br /> and aerators, all funded from Recreation EF. In FY2013, a Toro or Jacobsen 3400 Mower Replacement <br /> used for green's work is expected to cost $42,000. In FY2015, a Toro Grounds Master 4500D mower for <br /> cutting the rough replaces the present model for $52,000, and in FY2016, Toro Workman Utility vehicle <br /> costing $20,000 and a Toro Aerator for $25,000 will replace present models. In addition, Phase II of the <br /> dam restoration and drainage project (Phase I now complete) is slated for FY2014 for $259,000 from the <br /> Recreation EF. Included will be regrading the fairways and adding drainage at the 1St, 2nd, and 8th holes. <br /> Recreation 5-Year Capital Appropriation History (All Funding Sources) <br /> Program FY2007 FY2008 FY2009 FY2010 FY2011 <br /> Athletic Fields $50,000 $177,000 $70,000 $50,000 <br /> Playgrounds &Tot Lots $225,000 $75,000 <br /> Golf Course $25,000 $200,000 <br /> Swimming (Old Res & Center)t $50,000 $60,000 $569,000 $25,000 <br /> Tennis & Basketball $235,000 $60,000 <br /> Center Playfields Drainage $875,173 <br /> Totals $300,000 $285,000 $372,000 $839,000 $950,173 <br /> t$20,000 of the FY2009 appropriation was not used as the FY2010 appropriation <br /> incorporated that same scope. <br /> 28 <br />