Laserfiche WebLink
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2011 ATM <br /> Fire Department 5-Year Capital Appropriation History (All Funding Sources) <br /> FY2007 FY2008 FY2009 FY2010 FY2011 <br /> Fire Trucks $380,000 $80,000 $500,000 <br /> Rescue-Ambulances $200,000 <br /> Fire-Department HQ1 $35,000 $40,000 $100,000 <br /> Fire-Hydrant Replacement2 $50,000 $50,000 <br /> East Lexington Fire Station $47,500 <br /> Wireless Fire Alarms $142,000 <br /> Munroe Center Evaluation $35,000 <br /> Munroe Fire-Protection Systema $579,550 <br /> Fire-Monitoring of Historic $18,120 <br /> Houses <br /> Police&Fire/EMS Mobile $156,000 <br /> Computerization4 <br /> Self Contained Breathing <br /> Apparatus $260,000 <br /> Fire HQ Alarm Receiver $30,000 <br /> Totals $380,000 $360,120 $1,073,050 $600,000'`$290,000 <br /> Notes <br /> 1 Women's Shower(FY2008);Redesign Study(FY2009&2010[includes$29,700 CPF) <br /> 2 Includes$25,000 each year from Water Enterprise Fund <br /> 3 CPF(Ultimately completed for$345,325) <br /> 4 Joint with Police(shown in both departments) <br /> Police <br /> The Lexington Police Department, which provides public safety services through a team of dedicated <br /> police officers, detectives, dispatchers and support staff, is supported by the Town's Capital Program in <br /> the areas of communication systems, computer systems, and improvements to the facility in which it is <br /> housed. <br /> A professional-services contract was awarded on February 19, 2010, to Donham & Sweeney Architects <br /> (D&SA), as authorized by the 2009 ATM approval of Article 11(g), to conduct a space-needs study of <br /> how to better to preserve and renovate the Police Department Headquarters in light of how it is staffed <br /> today and the Department's current and future mission requirements. The D&SA report indicated that the <br /> structure of the existing building could not be altered in anyway without "triggering" the latest Seismic <br /> Code requirements, which would require major structural alterations. The preliminary study, completed in <br /> November, 2010, suggested the ideal solution would be essentially to double the existing square footage <br /> by extending the building into the existing parking lot at the rear of the Police Station. <br /> We note that the proposed 5-Year Capital Plan does not contain any project(s) for improving the existing <br /> facility, although it does include a software improvement project for Police & Fire Departments in <br /> FY2016. <br /> Police Department 5-Year Capital Appropriation History (All Funding Sources) <br /> FY2007 FY2008 FY2009 FY2010 FY2011 <br /> Dispatch Room Renovation $842,000 <br /> Police & Fire/EMS Mobile $156,000 <br /> Computerization2 <br /> Police Station Space $45,000 <br /> Preservation & Needs Study <br /> Police Station Ventilation $31,700 <br /> System 3 <br /> Notes <br /> 1 Includes$100,000 from CPF <br /> 2 Joint with Fire (shown in both departments) <br /> 20 <br />