|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2011-03-CEC-ATM-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Town Meeting Minutes and Reports
>
2010-2019
>
2011
>
Reports
>
2011-03-CEC-ATM-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 4:16:21 PM
Creation date
5/6/2015 12:01:21 PM
Metadata
Fields
Template:
Archives
Year
2011
Author or Source
Capital Expenditures Committee
Department
Town Clerk
Keywords or Subject
Town Meeting CAPITAL EXPENDITURES COMMITTEE REPORT TO 2011 ATM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2011 ATM <br /> Fire Department 5-Year Capital Appropriation History (All Funding Sources) <br /> FY2007 FY2008 FY2009 FY2010 FY2011 <br /> Fire Trucks $380,000 $80,000 $500,000 <br /> Rescue-Ambulances $200,000 <br /> Fire-Department HQ1 $35,000 $40,000 $100,000 <br /> Fire-Hydrant Replacement2 $50,000 $50,000 <br /> East Lexington Fire Station $47,500 <br /> Wireless Fire Alarms $142,000 <br /> Munroe Center Evaluation $35,000 <br /> Munroe Fire-Protection Systema $579,550 <br /> Fire-Monitoring of Historic $18,120 <br /> Houses <br /> Police&Fire/EMS Mobile $156,000 <br /> Computerization4 <br /> Self Contained Breathing <br /> Apparatus $260,000 <br /> Fire HQ Alarm Receiver $30,000 <br /> Totals $380,000 $360,120 $1,073,050 $600,000'`$290,000 <br /> Notes <br /> 1 Women's Shower(FY2008);Redesign Study(FY2009&2010[includes$29,700 CPF) <br /> 2 Includes$25,000 each year from Water Enterprise Fund <br /> 3 CPF(Ultimately completed for$345,325) <br /> 4 Joint with Police(shown in both departments) <br /> Police <br /> The Lexington Police Department, which provides public safety services through a team of dedicated <br /> police officers, detectives, dispatchers and support staff, is supported by the Town's Capital Program in <br /> the areas of communication systems, computer systems, and improvements to the facility in which it is <br /> housed. <br /> A professional-services contract was awarded on February 19, 2010, to Donham & Sweeney Architects <br /> (D&SA), as authorized by the 2009 ATM approval of Article 11(g), to conduct a space-needs study of <br /> how to better to preserve and renovate the Police Department Headquarters in light of how it is staffed <br /> today and the Department's current and future mission requirements. The D&SA report indicated that the <br /> structure of the existing building could not be altered in anyway without "triggering" the latest Seismic <br /> Code requirements, which would require major structural alterations. The preliminary study, completed in <br /> November, 2010, suggested the ideal solution would be essentially to double the existing square footage <br /> by extending the building into the existing parking lot at the rear of the Police Station. <br /> We note that the proposed 5-Year Capital Plan does not contain any project(s) for improving the existing <br /> facility, although it does include a software improvement project for Police & Fire Departments in <br /> FY2016. <br /> Police Department 5-Year Capital Appropriation History (All Funding Sources) <br /> FY2007 FY2008 FY2009 FY2010 FY2011 <br /> Dispatch Room Renovation $842,000 <br /> Police & Fire/EMS Mobile $156,000 <br /> Computerization2 <br /> Police Station Space $45,000 <br /> Preservation & Needs Study <br /> Police Station Ventilation $31,700 <br /> System 3 <br /> Notes <br /> 1 Includes$100,000 from CPF <br /> 2 Joint with Fire (shown in both departments) <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.