|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2014-03-24-CEC-ATM-STM-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Town Meeting Minutes and Reports
>
2010-2019
>
2014
>
Reports
>
2014-03-24-CEC-ATM-STM-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 4:17:46 PM
Creation date
5/6/2015 11:58:00 AM
Metadata
Fields
Template:
Archives
Year
2014
Author or Source
Capital Expenditures Committee
Department
Town Clerk
Keywords or Subject
Town Meeting CAPITAL EXPENDITURES COMMITTEE REPORT TO 2014 ATM&2014 STM (Mar 24th)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2014 ATM&2014 STM(Mar 24th) <br /> (n) fldninistrative Budget 11 <br /> Article 9: Appropriate for Recreation Capital Projects 45 <br /> Article 10: Appropriate for Municipal Capital Projects and Equipment 45 <br /> (a) Center Streetscape Improvements andEasemnents 15 <br /> (b) DPWEquipmnent 16 <br /> (c) Street Improvements andEasemnents 16 <br /> (d) Storm Drainage Improvements and NPDES Compliance 17 <br /> (e) Hydrant Replacement Program 17 <br /> (f( Comprehensive WatershedStormn Water Afanagement Study and Implementation <br /> Measures 17 <br /> (g) Massachusetts fl venue Intersections'Improvements and Easements 18 <br /> (h) Sidewalk Improvements and Easements 18 <br /> (0 Dam Repair 18 <br /> (l) Town Wide Culvert Replacement 19 <br /> (k) Town Wide Signalization Improvements 19 <br /> (1) Traffic Island Renovation 19 <br /> (m) Ambulance Replacement 50 <br /> (n) Heart Monitors 50 <br /> (o) Replace Town Wide Phone Systems–Phase III 50 <br /> (p) Network Redundancy and Imnpro vemnent Plan Phase II 51 <br /> Article 11: Appropriate for Water Distribution System Improvements 51 <br /> Article 12: Appropriate for Wastewater System Improvements 52 <br /> (a) Sanitary Sewer System Investigation andImnprovemnents 52 <br /> (b) Pump Station Upgrades 52 <br /> Article 13: Appropriate for School Capital Projects and Equipment 53 <br /> (a) System Wide School Furniture 53 <br /> (b) School Technology Capital Request 53 <br /> (c) School Trac Mitigation for SafetyAnalysis 51 <br /> (d) SchoolflED Replacement 51 <br /> Article 14: Appropriate for Public Facilities Capital Projects 54 <br /> (a) School Building Envelope and Systems 55 <br /> (b) LHS Heating Systems Upgrade Phases 2 and 3 55 <br /> (c) Municipal Building Envelope and Systems 55 <br /> (d) Extraordinary Repairs/Replacements/Upgrades 56 <br /> (e) School Paving Program 57 <br /> (fi East Lexington Fire Station Physical Fitness Room 57 <br /> (g) Public Facilities BidD0cumnents 57 <br /> (h) Middle School Science, Performing rts and General Education Space 57 <br /> (0 Clarke School Elevator Upgrade 58 <br /> (l) Clarke School fluditoriumn Audio Visual System 58 <br /> (k) Fire Station Headquarters Design 59 <br /> Article 16: Rescind Prior Borrowing Authorizations 59 <br /> Article 17: Establish and Appropriate To and From Specified Stabilization Funds 60 <br /> Article 18: Appropriate to Stabilization Fund 60 <br /> Article 19: Appropriate from Debt Service Stabilization Fund 61 <br /> Article 22: Appropriate for Authorized Capital Improvements 61 <br /> Article 23: Amendments to the District Agreement of the Minuteman Regional Vocational <br /> School District 62 <br /> Appendix A: CPA Fund—Project Revenues and Expenditures A-1 <br /> Appendix B: Information on the Town's Current Specific Stabilization Funds B-1 <br /> Appendix C: Summary of Warrant-Article Recommendations C-1 <br /> ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.