|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2010-11-09-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010-2019
>
2010
>
2010-11-09-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:35 PM
Creation date
4/17/2015 1:33:39 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC Meeting Minutes <br />09 November 2010 Meeting <br />5.0FireandPoliceStudyandDesign <br />5.2ConfirmationofFireDepartmentSpaceneeds <br />04/13/10 <br />ConfirmationofFireDepartmentSpaceneedswasdiscussedandthearchitectsreport95%finalized,willreportnextmeeting. <br />5/11/10 <br />Donham&SweeneyreviewedMaguireStudywiththeChief.SquareFootneeds+/1,000sf,chiefisinagreement. <br />8/10/10 <br />TheChiefwillcoordinatesitevisitswithlocalnewlybuiltfirestations,Belmont,Wilmington,Wakefield. <br />5.3PoliceDepartmentSpaceNeeds <br />04/13/10 <br />DevelopmentofPoliceDepartmentspaceneedswascompletedandtransmittedtoPBC. <br />ChieftoreviewwithStaffandArchitectstomeetwithPolicestafftoreview <br />Therewasdiscussionastowhomshouldchallengethespaceneedsofthisoranyprogramdeveloped. <br />5/11/10 <br />Policeprogramwasreviewedwithstaff.Thefiringrangeandlockersizesareissuesstillindiscussion.TheArchitectsaretocontinue <br />tomeetwiththePoliceDepartmentrepresentatives. <br />ЏΉЉБΉЊЉ <br />{ƦğĭĻƦƩƚŭƩğƒƒźƓŭźƭƚƓŭƚźƓŭ͵5źƭĭǒƭƭźƚƓƚŅƌƚĭƉĻƩƭźǩĻğƓķŅźƩźƓŭƩğƓŭĻƭƷźƌƌƚƓŭƚźƓŭ͵ <br />5.4ZoningassessmentReport <br />04/13/10 <br />ZoningassessmentReportwasdeliveredtothePBCandreviewed <br />PBCrecommendedArchitectsmeetwithTownZoningofficialtoreview. <br />5/11/10 <br />Regulatoryreviews,Donham&Sweeneymetwithzoningofficerreviewedmadecorrectionsandresubmitted. <br />Existingvs.proposedareasofreliefneeded. <br />FinaldocumenttogotoTowncounsel. <br />5.5FireStationSiteSurvey <br />04/13/10 <br />AsitesurveywasinitiatedandtheArchitectsexpectresultbythenextmeeting. <br />5/11/10 <br />DiscussionabouttheMonitoringwellsandfiltrationsystemattheFiresiterevolvedaroundlimitationsondevelopment.Mark <br />BarretttoFollowup. <br />6/08/10 <br />Emaildistributedinformationavailabletoallpartiesonthemonitoringwells. <br />9/14/10 <br />Donham&SweeneymetonsitewithConservationagentwhorecommendedflaggingthewetlands. <br />5.6PoliceSitePlandevelopmentOptions <br />04/13/10 <br />VariousoptionsforhowthepolicestationpropertycouldbedevelopwhenconsideringasubstantialadditiontothePoliceStation <br />andhowthesemightimpactontheexistingwhitehouseandparkingoverall. <br />TheArchitectswereinformedofpriorstudiesinthisareathatcouldprovideinformationaboutparking.DPFtotransmitto <br />Architectsavailabledocuments. <br />5/11/10 <br />Conceptdesignoptionswerereviewed.Capt.h\[ĻğƩǤpointedoutmonitoringwellsonsite.MarkBarretttofollowup. <br />Page 8 of 11 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.