Laserfiche WebLink
drive through that can handle an ambulance at 26' plus an 8' gurney or two cruisers in tandem <br />configuration. <br />• J. Shaw presented 3 concept design options for the Police Station. Comments included; <br />o Range to be eliminated. D &S to include in the report the costs for a new inexpensive <br />facility at the Hartwell Avenue site. <br />o Explore possibility of the main level of the addition being raised above the main level <br />of the existing facility; requires ramps or elevator for accessibility. <br />• The project is generally on schedule; the zoning analysis is ahead of schedule, the concept <br />design work is on schedule, and the analysis of the existing buildings is behind schedule. <br />• The next meeting is June 8. D &S was asked to bring some rough cost estimates. The July <br />meeting may include some folks from the CPA Committee. <br />