|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2009-11-10-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2000-2009
>
2009
>
2009-11-10-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:47 PM
Creation date
4/17/2015 1:12:35 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC Meeting Minutes <br />10 November 2009 Meeting <br />4.3 Progress presentation <br />7/14/09 <br />Presentation by Architect, Menders Torrey Spencer for Stone Building Historic Structures Report Study work at next <br />meeting 8/11/09 at 7PM. <br />8/11/09 <br />Lynne Spencer and Patrick Guthrie made a presentation of their work and discoveries relative to the Historic Structures <br />report and Study project for the Stone Building. The presentation was in a power point format and is planned to be made <br />available through the Library website. The report to date includes historical information and findings on the building, <br />interpretive drawings of how the original addition likely looked, relative to massing, fenestrations, and layout. Topics <br />touched on included potential occupancy levels of the lyceum room on the second floor. Some members of the <br />audience/town felt that a higher occupancy of the lyceum should not be ruled out based solely on costs to improve <br />structure and that options should be made known. <br />The final report is due at the end of September. The architects will transmit to the DPF at the 8/20/09 meeting a scope of <br />work for interim or “button up” repairs that should be completed prior to winter 2009 and are expected to cost less than <br />$10,000.00. <br />The architects have meet with the Heritage Center Committee to discuss programmatic needs for the building and some <br />concept test drawings will be developed showing how best these programmatic needs may fit with in the existing building <br />and it’s historical fabric and character. <br />Estimates will be included in the final report for “total project” including any addition. <br />The estimates should reflect that any construction activity may not occur until 2011. <br />11-10-09 <br />Motion to support the Envelope Stabilization Project identified in the MTS Report for the Stone Building in the <br />amount of $201,000.00 <br />Motion: Jon Himmel Second: Carl Oldenburg Vote: Unanimous <br />Next Meeting: <br />12/08/09 <br />Public Services Building, 201 Bedford St. 7:00 PM <br />Meeting Adjourned 9:45 PM <br />Motion to Adjourn <br />Motion: Eric Brown 2nd: Dick Perry Voted: Unanimous <br />Page 9 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.