Laserfiche WebLink
PBC Meeting Minutes <br />10 November 2009 Meeting <br />2.3 Commissioning Status <br />For the purposes of reducing ongoing printed text previous entries under this heading may have been removed from <br />current meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />8/11/09 <br />David Fennel of Sebesta Blomberg made a report to the PBC on the status of the commissioning work. <br />Functional testing is complete. <br />a. Training needs to take place on the majority of items. <br />b. SB is confident that everything has been installed per the design drawings and is operating correctly. <br />c. Lighting controls have been evaluated through the use of data loggers and SB is currently evaluating the <br />results. <br />d. SB reports they will also be evaluating the exterior lighting in a similar manner. <br />e. HKT is reportedly investigating the need for an audible alarm in the veh. Staging & prep area tied to the CO <br />system. <br />f. SB reviewed the corrective action log with the PBC. <br />g. RTU-1 was discussed with respect to modifications being made to unit through discussions with manufacturer. <br />A 40 amp fuse is being increased to 50 amp upon manuf. Recommendation and a letter is being sought by SB from the <br />manuf. Documenting warranty of the fuse change. <br />Condenser fan motor has been tripping out and a fuse change was recommended there as well per the manuf. a letter <br />has also been requested o that item for warranty. <br />The motor for the energy recovery wheel was replaced yesterday. <br />DPF is seeking confirmation that RTU-I is capable of meeting the cooling and ventilation loads as specified. SB States <br />that we should be able to verify that by a test on the system simulating balancing conditions, he will coordinate with DPF. <br />h. PBC requested if searchable PDF files were owned under the contract for Operation and Maintenance manuals. <br />SB is investigating warranty time frames with engineer and manufacturer for RTU-1. <br />9/8/09 <br />Waiting for an updated balance report and letters from manufacturer. Training to start 9/10/09. <br />10/13/09 <br />Scheduled meeting to review training Mark Barrett will report in November. <br />11/10/09 <br />A meeting was held with all interested parties in attendance to review the performance and testing of RTU-1 as <br />installed in the building, as well as all outstanding punch list items relative to HVAC. Meeting resulted in <br />positive responses on outstanding items, with plans to follow up and completion for acceptance by the owner. <br />One follow up item to RTU-1 issue is an independent testing/balancing of the system to confirm reports <br />provided by subcontractor. This work is to be scheduled. <br />2.4. DPW Construction Schedule <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from <br />current meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />9/8/09 <br />Pavement settlement, paving will start the end of week 9/11/09. Landscaping, fall planting will start when paving is <br />completed. Some planting holdover until Spring. <br />Punch list is ongoing <br />10/13/09 <br />. <br />Paving complete, plantings this week, punch list is ongoing <br />Landscaping, minor electrical, signage and LEED Documentation to be addressed by CTA. Carpet tile issues meeting in <br />@ 2 weeks to review findings and discuss solutions. <br />11/10/09 <br />Ongoing punch list. HKT to push to finish. Any remaining site work would have to be completed in the Spring. <br />PBC requested that if significant efforts were not made to complete the punchlist items, that an officer of CTA be asked <br />to attend the next meeting. <br />HKT reports many items have been completed and punch list also contains items that have been ongoing such as <br />signage and review of RTU-1. <br />HKT / DPF is waiting for a letter from the carpet manufacturer regarding the warranty and or repair or replacement of <br /> <br />carpet in the building. <br />Page 3 of 9 <br /> <br />