|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2009-09-08-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2003 - 2009
>
2009
>
2009-09-08-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:47 PM
Creation date
4/17/2015 1:10:58 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC Meeting Minutes <br />11 September 2009 Meeting <br />2.34 Movers <br />5/19/09 <br />The PBC approved the award of a Purchase Order to Sterling movers for the relocation services of the DPW and DPF <br />Offices. <br />Motion to approve quote of $8,684.00 to Sterling Movers. <br />Motion Eric Brown Second: Dick Perry Vote Unanimous <br />8/11/09 <br />The remaining move element is for the moving of the Vault contents which will be completed after the high <br />density files are completed. Vendor is being paid for completed portions of the move. <br />2.40 Pavement testing <br />6/24/09 <br />Pavement Testing $3,50.00 <br />Motion to approve $350.00 for Pavement testing. <br />Motion: Dick Perry Second: Jon Himmel Vote Unanimous <br />9/8/09 <br />$6,600.00 F.S.T invoice to be paid by contractor. <br />2.43 PCO 143-Head End Electrical <br />7/14/09 <br />Additional Electrical requirements are needed at the new Head end room. <br />PBC discussed need for improved planning to identify all scope items for a change order, in advance to avoid making <br />piecemeal approvals and to identify the full costs of a change up front. <br />Motion: To approve additional electrical work identified in PCO 143 in the amount of 29,351.13 <br />Motion: Eric Brown Second: Peter Johnson Vote: Unanimous <br />2.54 PCO 131 – Sealing Wash Bay <br />7/14/09 <br />PCO was not approved, HKT to investigate responsibilities of subcontractor. <br />9/8/09 <br />CTA performed work. <br />2.55 PCO 130 – Exterior Corrugated Metal Panel <br />7/14/09 <br />HKT still investigating <br />Issue involves proper sealing of the building skin, specifically at seams and penetrations prior to the installation of the <br />metal panels. PBC recommends review of clerk of the works photos and videos during construction to gain confidence in <br />thoroughness of work and the removal of selected panel locations as a sampling to expose area and inspect for proper <br />sealing. <br />9/8/09 <br />HKT to investigate materials used and to quantify number of locations where product was used after <br />penetrations through finished wall system. Also PBC recommends a review of the condition 9 months in to <br />the 1 year warranty period to identify problems in advance if they exist. <br />Page 6 of 10 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.