Laserfiche WebLink
30 June 2009 <br />Meeting Minutes <br />Lexington Permanent Building Committee (PBC) <br />Location: 146 Maple St. Conference Room <br />Date & Time: 24 June 2009, 5:00PM <br />7. A reduced budget ($180,000) was outlined for re-issuance to CPC for a modified scope for moving forward, to <br />include a Historic Structures report and design such that a 2010 request could be made for monies for <br />construction documents. <br />2-10-09 <br />General Discussion on the Stone Building project continued and is summarized below: <br />This Project is requesting $180,000 in Community Preservation Act funds to preserve the historic Stone <br />Building by stabilizing the structure. The first step of the stabilization process will entail a Historic Structures <br />Report (HSR) augmented by further existing conditions assessment; all of this will be the basis of the <br />Stabilization bid documents. Strategic building stabilization repairs will be bid and completed within these <br />funds. <br />Concurrent with this Stabilization process, the Town needs to identify the users and then fully describe the <br />building program. Should there be any residual money left from the stabilization effort, that money will be put <br />towards preliminary programming of the space for an identified user. <br />A year or more out, with the building stabilized and the building program fully described and vetted, the <br />Stone Building will again be before Town Meeting for funds to hire an Architect/Engineer team to complete <br />design and bid documentation for the full renovation of the building. That Architect/Engineer team will utilize <br />the Historic Structure Report (HSR) and the completed code analysis, structural, mechanical, electrical, and <br />plumbing systems preliminary analysis that are a part of the recently completed Feasibility Study. Thereafter, <br />once the bid documents are complete, the Project will again be before Town Meeting for a vote on <br />appropriating Construction dollars. <br />3-10-09 <br />No further development. Jon Himmel reports that a meeting is pending for discussion on the time lines for <br />the project and next steps. <br />4.2 Stone Building Designer Selection <br />5/19/09 <br />Architects are submitting proposal for the Stone Building HSR phase. <br />A committee is being formed for the Designer selection Committee of which two members of the <br />PBC are being requested. <br />Dick Perry and Carl Oldenburg volunteered to represent the PBC on this committee <br />Next Meeting: <br />7/14/09 <br />Public Services Building, 201 Bedford St. 7:00 PM <br /> <br />Meeting Adjourned 7:00 PM <br />Motion to Adjourn <br />Motion: Dick Perry 2nd: Eric Brown Voted: Unanimous <br />Page 12 of 12 12 <br />