Laserfiche WebLink
22 August 2008 <br />Meeting Minutes <br />Lexington Permanent Building Committee (PBC) <br />Location: Cary Memorial Hall-Estabrook Meeting Room <br />12 August 2008 <br />Date & Time: , 7:00PM <br />7/8/08 <br />Selection of the Stain color for the Salt / Sand shed was deferred to the next meeting, however Zinc <br />Grey was selected as the color of the Roof for the Cold Storage Building. <br />8/12/08 <br />Exterior colors are to be examined on-site with a couple of options shown for the canopy channels. <br />HKT to acquire metal roof samples for the sand and salt shed for review with the siding colors. HKT <br />to confirm the date required by the contractor for the color selection for the siding. Meeting to be <br />held August 26 at 7:30 at the job site. <br /> <br /> <br />3.0 STONE BUILDING <br />3.1. Stone Building DPF <br />5/13/08 <br />Pat Goddard advised that HKT was making a presentation to the Library Trustees as to the status of <br />the project, Tuesday Morning 5/20/08 at 8:00 AM. <br />6/10/08 <br />Discussions on update of the stone building project. DPF to request HKT architects send a <br />representative to the 08 July 2008 Meeting for an update presentation. <br />8/12/08 <br />Pat Goddard advised that he has requested HKT Architects to make a presentation to the PBC on the <br />Stone Building Study Project at the September PBC Meeting. <br />9 <br /> <br />