Laserfiche WebLink
15 October 2008 <br />Meeting Minutes <br />Lexington Permanent Building Committee (PBC) <br />Location: Cary Memorial Hall-Estabrook Meeting Room <br />14 October 2008 <br />Date & Time: , 7:00PM <br />2.9. Furniture <br />5/13/08 <br />HKTÔs Furniture Proposal was reviewed and approved. <br />The PBC accepts HKTÔs fee proposal, with HKT agreeing not to charge additional funds to redesign if the <br /> <br />furnishings were to go over the budget line item. Eric, Carl all approved. <br />6/10/08 <br />Discussions on furniture selection in relation to interior finishes and color selections. HKT to meet with users <br />to confirm and fine-tune already established needs. Then HKT and user heads will meet with vendors from <br />state bid list. HKT expects this process to begin within a month. PBC concerned about selecting interior <br />finishes without knowing furniture color and fabric options. HKT stated that the interior finishes / color palette <br />could be selected and still have options on furniture colors. Process needs to be fulfilled on selecting <br />vendor in order to comply with state vendor contract. HKT was sure that any of the selected vendors could <br />meet the selected finishes / color palette. <br />7/8/08 <br />Janet from HKT provided update Ï Four vendors have been interviewed and evaluated based upon a set of <br />pre-established criteria. This work was performed by HKT in conjunction with Pat Goddard and Jim <br />McLaughlin. HKT will have 1 or 2 final vendors selected for furniture by next PBC meeting, which will define <br />the actual furniture lines that are available to the Town. HKT will meet with user groups to define furniture <br />needs and scope. HKT will make a presentation to the PBC on the proposed furniture line and elements for <br />approval. <br />8/12/08 <br />HKT has sent out requests to two furniture vendors for price quotes requests on a sample office and expects <br />staff interviews to begin in September. <br />10-14-08 <br />Pat Goddard, Mark Barrett and Bill Hadley or designee will be viewing furniture at two vendor <br />sites WB Mason and Office Resources 10/15/08. <br />2.14 Interior Finishes HKT <br />6-10-08 <br />HKT reports that they are still waiting for a few submittals to come in so that they can build the color palette <br />for presentation of interior finishes. PBC is concerned with the timing of the interior finishes selections and <br />how they relate to the furniture. <br />PBC requests that HKT bring all the materials necessary for interior finishes review to the extent they have <br />received from the submittal process, to the next PBC meeting. <br />Color Scheme Board #1 was the general color direction that the PBC agreed upon. They also expressed <br /> <br />interest in combining Concept A (Views) + B (Light) for the way color would be used in the building. <br />7/8/08 <br />HKT presented multiple color and sample schemes of the interior finishes as well as floor tile patterns and <br />accent wall coordination. The PBC reviewed the color and sample options and agreed upon the following <br />actions: <br />The items from the scheme that the PBC would like to reconsider or get larger samples of are the following: <br />1) Solid surface material for use on the horizontal surfaces at the transaction windows in the lobbies <br />2) Toilet Room mosaic floor tile, wall tile <br />3) Toilet Room colors <br />4) Coordination of toilet/locker room lockers, flooring, wall tiles and paint colors <br />5) Rubber wall base colors: one selection or coordinated with accent wall color <br />6) Wall color at wood seating area in second level lobby <br />7) PBC recommended looking at a more durable material than drywall to be used on the wall above seating <br />area/bench in lobby area. <br />8) PBC asked to look @ lighting in lobby with concern over being able to change lamp. <br />In addition, the PBC would like to take another look at the following items: <br /> <br />1) Floor pattern with selected colors for the linoleum in the lunchroom and adjacent corridor <br /> <br />6 <br /> <br />