17 September 2008 <br />Meeting Minutes <br />Lexington Permanent Building Committee (PBC) <br />Location: Cary Memorial Hall-Estabrook Meeting Room <br />09 September 2008 <br />Date & Time: , 7:00PM <br />2.4. DPW Construction Schedule Ongoing <br />5/13/08 <br />The PBC reviewed the construction schedule from CTA <br />a. Slack should appear on the schedule Ï HKT to coordinate. <br />b. Critical Path items to be shown in red Ï HKT to ask CTA to provide a PDF in color for review <br />c. Discussion on what should happen if CTA is to submit a delay claim. HKT stated that a letter <br />was issued by CTA about the unforeseen conditions found at the site and the winter weather. HKT <br />stated that their preference is to address this issue as we get closer to substantial completion as the <br />schedule is still on track and there is a good relationship with CTA which would like to continue <br />d. The PBC was concerned about the lack of time for commissioning and ask HKT to address <br />with CTA and SB. <br />6/10/08 <br />Color copies of the construction schedule were distributed. Work appears to be on schedule with <br />the building largely complete by first Qtr. 09. <br />7/8/08 <br />Color copies of the construction schedule were distributed. Work for the building appears to remain <br />on schedule for substantial completion on 29 April 2009. However scheduled site work and paving <br />has been moved on the schedule to spring of 2009 extending to summer of 2009. The reason for <br />this is a cautionary move based upon the current limitations at the rear of the site due to the <br />environmental work being evaluated and the impact this has on the GCÔs ability to construct the <br />sand and salt shed and initiate full site work and paving operations before November of 2008. <br /> <br />This situation will continue to be evaluated. There was discussion to fast-tracking as much as <br />possible the balance of site work, test pitting and remediation so as to turn over as much of the site <br />as possible to allow a predominant amount of site construction to happen as originally scheduled <br />and minimize the amount of site work that would have to carry over to spring / summer 09, and <br />therefore reduce potential extra costs. <br />8/12/08 <br />Work for the building remains to appear, largely, on schedule, relative to a spring 09 completion. <br />There was some discussion regarding the timing of the Certificate of Occupancy, as the delayed site <br />work issues are artificially pushing out the Certificate of Occupancy (CO) date. PBC requested <br />inserting a temp CO date to pull back building completion for use and allowing extended site work to <br />stand on its own. <br />HKT outlined discussions with CTA regarding their intent to update schedule to reflect the large <br />majority of site work to be completed this fall as originally scheduled with only the rear portion of the <br />site or as needed to carry over to a delayed spring due to the environmental issues currently being <br />resolved. <br /> <br />9/9/08 <br />Updated schedule distributed. Building on schedule. Certificate of Occupancy 4/29/09. Schedule <br />broken out to show rear of site work continuing into summer of 09. <br />Questions about temporary heat or system start up for temporary heat, needs to be discussed. <br /> <br /> <br /> <br /> <br />4 <br /> <br />