Laserfiche WebLink
AC–2015ATM <br />PPROPRIATIONOMMITTEE <br />A majority Committee does not feel that 11(k) (Hastings Park Undergrounding Wires) is a prudent use of <br />funds at this time. <br />The Committee recommends disapproval of 11(k) (2-5-1) <br />The Committee recommends approval of 11(a,b,c,d,e,f,g,h,i,j,l,m,n,o,p,q,r,s) (8-0). <br />FundsFundingCommittee <br />Article 12: Pleasant Street Sidewalk <br />RequestedSourceRecommendation <br />IP <br />$20,000GF <br />This request is to appropriate funds for a feasibility study for a new sidewalk connecting an existing, in- <br />terrupted segment on Pleasant Street. The area in question is not far from Wilson Farm and Sacred Heart <br />Church and was confirmed by the 2014 Pedestrian Accessibility Report to be an area with high pedestrian <br />volume. <br />At press time, the Town Manager had proposed that the FY2016 capital budget for sidewalks, under Arti- <br />cle 11(e), be increased to $600,000, a $200,000 increase from FY2015 and that the projects under Articles <br />12 and 13 be covered under Article 11(e). If Article 11(e) passes, Article 12 and 13 will be indefinitely <br />postponed. However, the Committee has voted to recommend approval of this request if necessary. <br />The Committee anticipates action on this request will be indefinitely postponed. <br />FundsFundingCommittee <br />Article 13: Prospect Hill Sidewalk <br />RequestedSourceRecommendation <br />IP <br />$100,000GF <br />This request is to appropriate funds for construction of a new sidewalk Prospect Hill Road. The area in <br />question is not far from The Bridge School and was confirmed by the 2014 Pedestrian Accessibility Re- <br />port to be an area with high pedestrian volume. <br />At press time, the Town Manager had proposed that the FY2016 capital budget for sidewalks, under Arti- <br />cle 11(e), be increased to $600,000, a $200,000 increase from FY2015 and that the projects under Articles <br />12 and 13 be covered under Article 11(e). If Article 11(e) passes, Article 12 and 13 will be indefinitely <br />postponed. However, the Committee has voted to recommend approval of this request if necessary. <br />The Committee anticipates action on this request will be indefinitely postponed. <br />FundsFundingCommittee <br />Article 14: Appropriate for Water <br />RequestedSourceRecommendation <br />System Improvements <br />Approve (8-0) <br />$900,000Water RE <br />This Article addresses proposed capital expenditures to be made during FY2016 as part of a continuing <br />program to upgrade and maintain the assets of the Water Enterprise Fund. For general background on the <br />enterprise funds, and the relationship between the budget process and the water rate setting process, <br />please see Appendix B and the discussion under Article 5. <br />A total of $900,000 is requested this year to replace unlined or inadequate water mains and deteriorated <br />service connections and to eliminate dead ends in water mains. The details of the projects, including the <br />locations where work is expected to be done, can be found in the Brown Book (p. XI-23). The costs of <br />28 <br /> <br />