Laserfiche WebLink
02/12/15 AC Minutes <br /> Minutes <br /> Town of Lexington Appropriation Committee <br /> February 12,2015 <br /> Place and time: Parker Room, Town Office Building, 8:00 p.m. <br /> Members present. Glenn Parker, Chair; John Bartenstein, Vice Chair and Secretary; Mollie Garberg; <br /> Alan Levine; Beth Masterman; Susan McLeish; Eric Michelson; Richard Neumeier; Andrei <br /> Radulescu-Banu; Rob Addelson (non-voting, ex officio) <br /> Members Absent: None <br /> Other attendees: Paul Ash, Superintendent of Schools; Margaret Coppe, Chair, School Committee; <br /> Joe Pato, Chair, Board of Selectmen (BoS); Kate Colburn, Lexington Parents Advocacy Group, Fiske <br /> Elementary School Parent Teacher Organization <br /> The meeting was called to order at 8:06 p.m. <br /> 1. Reserve Fund Transfer: Dr. Ash reported on a School Department request for a$150,000 <br /> Reserve Fund transfer to help cover the costs for the Lexington High School (LHS)Phase 2 <br /> prefabricated units capital project. A first set of units was installed during Phase l; Phase 2 involves <br /> the installation of a second smaller set of units for the intensive learning program. The low bid for <br /> Phase 2 came in $500,000 over the amount that was previously appropriated for the project. The bid <br /> has a one month acceptance window, which ends in two weeks. Rebidding would result in missing <br /> the fall 2015 deadline for accommodating students who are now in the middle schools and ready to <br /> move to LHS. An expensive alternative is sending these students to out-of-district programs. <br /> Dr. Ash added that the School Department anticipates taking $350,000, the balance of the $500,000 <br /> shortfall, from the Fiscal Year(FY) 2015 funds that are currently allocated for technical equipment <br /> and furniture. Those expenditures can be postponed until FY2016. The School Department plans to <br /> request $350,000 for technical equipment and furniture in FY2016 and withdraw a current FY2016 <br /> request for $350,000 for Diamond Middle School (Diamond) "Space Mining". Using $350,000 from <br /> the technical equipment and furniture appropriation plus the $150,000 from the Reserve Fund would <br /> allow the Town to sign a contract within two weeks for Phase 2 construction. <br /> Responses to questions included the following: <br /> • There were two bids for Phase 2; the low bidder happens to be the contractor that did Phase 1. <br /> • The design work for Phase 2 was not available when the Town went out to bid for Phase 1. <br /> • The FY2015 appropriation into the Reserve Fund was $900,000. <br /> • There is currently $784,380 in the Reserve Fund. <br /> • The Reserve Fund will be one of the primary resources for addressing the deficit that is <br /> building from recent snow and ice removal operations. <br /> A motion was made and seconded to make a Reserve Fund transfer of$150,000 for Phase 2 of the <br /> LHS prefabricated units. The motion was approved. VOTE: 9-0 <br /> 1 <br />